My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2007-02-28_REVISION - M1981044
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1981044
>
2007-02-28_REVISION - M1981044
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/15/2021 5:35:53 PM
Creation date
11/21/2007 3:56:28 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1981044
IBM Index Class Name
Revision
Doc Date
2/28/2007
Doc Name
Response to Adequacy Review
From
David Whitehead
To
DRMS
Type & Sequence
AM2
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
25
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
EXHIBIT E <br />RECLAMATION PLAN <br />Overview of Reclamation Plan: The reclamation plan for this site is simple and direct. <br />Few problems are expected with the reclamation other than the possibility of slow <br />vegetation development on south facing slopes and the possibility of erosion damage as a <br />result of the moderate erosion potential of the sandy to gravely soils. Both of these <br />problems aze common on upland gravel pits in this kind of material. With good <br />management techniques these problems can be significantly reduced. <br />The final land use will be rangeland. The final topographic configuration will result in an <br />elongated bowl with an outlet for water at the south end where it will connect with an <br />existing drainage. Slopes will be no steeper than 3.0:1. The more gradual the slopes will <br />be south to west facing while the steeper slopes will be north to east facing where the <br />revegetation potential is higher. <br />No ground water will be encountered and surface water will be handled by discharge into <br />existing drainage ways thus leaving the original flow volumes unchanged. Gradual slope <br />grades prior to dischazge from the site will aid in the control of sediment. <br />Topsoil will be replaced on the slopes and all other areas in the bottom of the pit where <br />revegetation will occur. Immediately after placement of the topsoil, a diverse seed <br />mixture will be planted. It is expected that full revegetation of reclaimed areas will occur <br />in 3 years, although steeper south facing slopes might take somewhat longer due to more <br />drought type conditions in those areas. <br />Final Land Use Selection: <br />Final Use Selected: The final land use selected for this operation is the same as the <br />current use of the immediately adjacent land, namely rangeland. This final land use is the <br />only use that can be selected for this site that has an assurance of being implemented. It is <br />possible the final land use for the site could change considerably prior to the completion <br />of the operation. The long duration of this operation and the expansion of Colorado <br />Springs eastward could lead to this land being developed for residential purposes. At this <br />time, however, development timing is too faz off to define and therefore rangeland was <br />selected as the final land use. <br />Comnatibility With Surroundin Lg ands: Surrounding land uses are quite variable. The <br />immediately surrounding land is rangeland and limited wildlife habitat primarily for <br />small game, birds and rodents. Beyond the immediately adjacent land are uses ranging <br />from farming, ranching, grazing, horse pasture, and residential. Many people living in <br />this area commute to Colorado Springs. Thus the chazacter of the land use in this area is <br />similaz to other small town locations throughout the Front Range corridor, in that it <br />exhibits a tremendous variety. <br />
The URL can be used to link to this page
Your browser does not support the video tag.