Laserfiche WebLink
999 <br /> and rate of material extraction , equipment availability <br /> and other considerations. <br /> In general mining is done in five steps: <br /> 1. Topsoil and other soils covering the gravel deposit <br /> ' are removed by earthmoving equipment. Generally, <br /> removal of these soils is scheduled to precede <br /> ' gravel removal closely to minimize surface <br /> disturbance. Careful planning of this step allows <br /> the stripped soil to be placed directly in its <br /> ' final location according to the reclamation plan, <br /> thereby minimizing handling costs and speeding <br /> ' reclamation activities . <br /> ' 2. Dry excavation entails the dewatering of the area <br /> ' to be mined by constructing trenches around its <br /> perimeter to collect the ground water and convey <br /> it away from the operation. <br /> ' 3. Once the ground water had been drained, excavation <br /> is accomplished by front end loaders and backhoe <br /> ' loading gravel onto trucks or a conveyor system <br /> ' for transportation to the processing plant. <br /> Excavation can also be by scrapers loading the <br /> ' gravel and transporting it to stockpiles. <br /> ' B-4 61-'EAZ- <br /> 1 <br /> �I <br />