Laserfiche WebLink
iii iiiiiiiiiiiiiiii <br />999 <br />E/~~i4 <br />S Coal Company Seneca Coal Company <br />RF~;EIVED <br />JUN 1 2 ~q95 <br />June 9, 1995 <br />Division or rvunerais a Geology <br />Ms. Erica Crosby <br />Division of Minerals and Geology <br />1313 Sherman Street, Room 215 <br />Denver, CO 80203-2273 <br />RE: Seneca II, Permit C-80-005, *?QV *?o. C-95-O1a <br />Dear Ms. Crosby: <br />This correspondence is a request for an extension of time for Step <br />1 of the remedial action necessary to abate this violation. This <br />action required that the topsoil stockpiled be removed from the <br />disturbed area and revegetated according to the requirements in the <br />permit. Because of the recent precipitation the mine has received, <br />we would like to wait until this topsoil material and ground <br />conditions have dried out. Therefore, the new deadline would be <br />Friday, June 23th. <br />Please contact me if you or any other members of the Division have <br />any questions regarding this request. <br />Sincerely, <br />Michael G. Altavilla, P.E. <br />Engineering Manager <br />c: Gary Wendt(PWCC) <br />Seneca Coal Company • P.O. Drawer D • Hayden, Colorado 87639 <br />Telephone (303) 276-3707 • FAX (303) 276-3074 <br />