Laserfiche WebLink
III IIIIIIIIIIIIIIII ,� <br /> _ STATL OF COLORADO <br /> MINED LAND RECLAMATION DIVISION oF��o� <br /> Department of Natural Resources Nri �o <br /> 1313 Sherman St., Room 215 , G r <br /> Denver,CO 80203 , ..may , <br /> 303 8 6 6-3 5 6 7 'ia�b ' <br /> FAX: 303 832 8106 <br /> Roy Romer. <br /> Governor <br /> March 16, 1992 Michael B.Long. <br /> Drvrsion Diremor <br /> Mr. Robert V. Mayne <br /> P.O. Box 125 <br /> Gypsum, CO 81637 <br /> Re: Dotsero Quarry, Succession Approval , Permit No. M-87-074, <br /> Revision No. SO-01 <br /> Dear Mr. Mayne: <br /> On March 9, 1992 the Colorado Mined Land Reclamation Board approved the <br /> succession of operators from Dotsero Block, Inc. to Robert V. Mayne for this <br /> operation. Robert V. Mayne is now the permitted operator of the Dotsero <br /> Quarry, and as such, is responsible for all provisions in- Permit No. M-87-074, <br /> as well as those specified in the Minerals Rules and Regulations. Dotsero <br /> Block, Inc . is relieved of all responsibilities concerning this operation (See <br /> Mineral Rules and Regulations Number 1 .7) . <br /> The Division would like to remind you, as the permitted operator, about a few <br /> things we feel are important: <br /> 1 . All of the application materials , as amended and supplemented, are an <br /> integral part of your permit. They have been incorporated into the permit by <br /> reference. We presume that you have a copy of all of these materials ; <br /> therefore, none have been enclosed with this mailing. We suggest that you <br /> keep a copy of the permit and the permit application at the mining operation <br /> as a reference for operating personnel , to help ensure compliance with the <br /> terms of the permit. <br /> 2. Changes in the mining and reclamation operations that differ from those <br /> described in the permit may require a revision to the permit. We suggest <br /> consulting the Mineral Rules and Regulations and/or contacting us to determine <br /> if a revision to the permit is necessary. Rule 1 .8 pertains to Amendments , <br /> Rule 1 .9 to Technical Revisions , and Rule 1 . 10 to Conversions . <br /> 3. On your permit anniversary date each year, you must submit an annual fee <br /> and annual report to us . Please consult Rule 3.4 for 110 Mineral Permits, <br /> Rule 2.4 i'or 112 Permits , and Statute Section 34-32-116( l )(a) for 111 Permits , <br /> for the specific annual report requirements applicable to your mine . <br /> If you have any questions , contact me . <br /> Sincerely, <br /> Gregg R. .,quire <br /> Reclamation Specialist <br /> GRS/ern 6502; <br />