Laserfiche WebLink
<br />ORDER <br />Based on the foregoing, the Board hereby enters the following order: <br />(1) BMRI stated in their Hydrogen Peroxide Tailings Treatment TR-007 application; <br />"Existing WAD (weak acid dissociable) cyanide concentrations in the tailings <br />impoundment will be reduced to less than 50 ppm...Peroxide will continue to be <br />added directly to the liquid pools until the WAD cyanide concentration drops <br />below 50 ppm." <br />If BMRI has not achieved tailings impoundment WAD cyanide level of 50 ppm or <br />less by July 3, 1992, BMRI shall immediately notify the Divisio~ and cease <br />operation of the ore processing plant until it has achieved theireduced WAD <br />concentrations. <br />WAD (weak acid dissociable) cyanide levels shall be determined jn accordance <br />with APHA/AWWA Standard Methods, 17th edition, method 4500-C. <br />(2) After July 3, 1992, if the WAD cyanide levels within the tailin~s impoundment <br />rise above 50 ppm, BMRI shall immediately notify the Division a d cease <br />operation of the ore processing plant until the WAD cyanide lev 15 have <br />returned to 50 ppm or lower. <br />(3) Immediately following the Division's approval of technical revi ion application <br />TR-008, BMRI shall submit well permit applications for the two roposed <br />additional monitoring wells. Further, BMRI shall contact Mr. G orge Van Slyke <br />of the Division of Water Resources to request verbal approval t proceed with <br />installation of the two monitoring wells. The Division will re uest that DWR <br />expedite approval of these well permits. ~. <br />Within thirty days following receipt of verbal approval from th DWR to install <br />the monitoring wells, BMRI shall install, complete, hydrologically test, <br />geophysically log, and sample the wells. BMRI shall also evalu to the data and <br />submit a report presenting BMRI's conclusion regarding the necessity of <br />additional ground water monitoring modifications. <br />Within thirty days following the Division's approval of the eval ative report <br />submitted in accordance with TR-008, BMRI shall install and complete any <br />necessary additional ground water monitoring wells. <br />If BMRI fails to meet any of the above deadlines, or any leakageis detected <br />from the tailings impoundment, BMRI shall immediately notify the Division and <br />cease operation of the ore processing plant. <br />(4> BMRI is to use all reasonably practical steps to continue to low~r the cyanide <br />levels in the pond to the lowest reasonably achievable levels, a d to continue <br />to use its best efforts at all times to achieve that goal. BMRI shall attempt <br />to lower the WAD cyanide to a target level of 35 ppm by July 20,1992. If at <br />any time the staff, or other parties, believe that BMRI is not doing everything <br />reasonably practical, BMRI can be brought back to the Board for further action, <br />including civil penalties and further corrective action orders. <br />-Z- <br />