My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2006-12-19_REVISION - M2001107
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M2001107
>
2006-12-19_REVISION - M2001107
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/16/2021 6:15:23 PM
Creation date
11/21/2007 3:49:39 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M2001107
IBM Index Class Name
Revision
Doc Date
12/19/2006
Doc Name
Adequacy Review Response
From
J&T Consulting, Inc.
To
DRMS
Type & Sequence
TR3
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
148
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
The following recommendations for monitoring of slope stability should be followed: <br />A visual inspection of the excavated high walls should be done on a weekly basis <br />for the first 6 months of mining. This inspection should consist of walking the <br />existing ground and looking for any signs of stress cracks or other potential signs <br />of slope failure. Some minor sloughing of high walls is expected on any mine site. <br />The intent of this inspection is to locate potential major slope failures that could <br />extend back into a structure. <br />A visual inspection should be done after a major precipitation event that has <br />saturated the ground using the same procedures. A major precipitation event <br />would be defined as a storm that produces an intensity level reached once in 50 <br />years on the average. <br />3. If a visual inspection detects signs of a potential slope failure, qualified personnel <br />should be contacted to evaluate and recommend remediation work to stabilize <br />the area. <br />4. If no visible signs of slope failure are detected within the first 6 months, then the <br />inspection period could be reduced to once per month or after every major <br />precipitation event. <br />NCCI Pit #1 <br />Sbpe Stability Analysis <br />Page 5 <br />
The URL can be used to link to this page
Your browser does not support the video tag.