Laserfiche WebLink
MPR, 15.2004 10:0BAM KERR_MCGEE M0. d96 P,4/14 <br />~~~~~) ~~~~~ ~~~~~~~ ~~~~~ III+ ~~~~~~ ~~~~~ ~~~ ~~~~~ ~~~~ ~~H <br />3076804 06n'4lP008 04•tiBP eNelA tAUnty, co <br />__ 3 of 13 R 86.00 0 0.00 Steve Merono Clerk 6 Retorter <br />4. BATTERIES AND EQUIPMENT (PROp'UC'C[ON FACt1.ITIE3). <br />KMRA4C ebaA have the right to locate, build, repair and maiot~n tanks, separators, <br />dehydtston, compressors and other equipment reasonably approptiatt for the opetadon <br />aad psoducdoa of aqy Exiatiag or Futum Wells within any of the Oil attd Gas Operadon <br />Areas shown on Exhibit A. <br />5. FLOWLINES AND PIP1rLIIVES. <br />a. [CMRMC and ICMG shall have the right to lay flowlines and pipelines, which to the <br />extent possible will be located under access roads to the Oil and Gas Operations <br />Ames. All pipelines shall be located at a surface depth of approximately 48 incites <br />from the Enal graded elevation. Flowlinea, which are de$ned as those lines which <br />carry water or hydrocarbons firm the wellhead to a production unit (such as a <br />separator), shall be buried to a surface depth of at leant 48 inches. The eonsaveden <br />end burying of flowlines and pipelines sha11 be at the sole east and expense of <br />[CMRMC or its gas purcheset. <br />b, Surface Owner will not allow any exttaedoa m occur, commencing at the suti'doe <br />of the original ground, closet than 35 feet from any flowliae or pipeline. <br />Surface Otvner shall rot allow nay stockpile of soil exceeding 5 feet In depth to be <br />placed over any flowline or pipeline. <br />d. When crossing pipelines or flowines wide heavy equipment, like earth moving <br />equipment, Surface Owner will maintain n minimum of four foot and a maximum <br />of 6 foot of dirt coverage, in addition to the existing cover over the pipeline. When <br />crossing pipelines or flowlines with crooks and lighter equipment Sutt$Ce Owner <br />will maintain a minimum of two foot and a taaximutn of 6 foot of dirt coverage, to <br />the existing cove over the pipeline or flowline. <br />o. The depth of cover over the pipelines or flowlinea shall not bo reduced or dmiaege <br />altered without ICMG's wettea approval. <br />E Any utility crossing must be a minimum of 18" inches beneath pipelines or <br />flowliaes. <br />g. Parallel utilities meat maintain a minimum of ten foe separation, udess [CMG or <br />KMItMC grants a lesser distance of separation, Surface Owner will request that all <br />utility companies contact IQvIG andlor KMItMC peon to layiAg lines paeallel to any <br />pipeline or tlowlioe. <br />boof~ <br />)IVd rT~TZ 9902/9Z/TT <br />b ONllllISN07 1 C ~ uoi;e;S xel LZ~6 9002 LZ noN :xej pan ya~ay <br />