Laserfiche WebLink
~ CLIMpJ~ MObadB~a~t w,roMn~gCa rM.opo~raNcion <br />September 19, 2006 <br />Certified Mail: 70041160 0006 3719 0092 <br />Mr. Allen Sorenson <br />Colorado Division of Minerals and Geology <br />1313 Sherman Street; Rm. 215 <br />acs c~~, <br />~ Cunnax Mnve <br />FMry 91 <br />Gimax, Colorado 8D429 <br />(719] 486-2150 <br />Fax (719] 486-2251 <br />RE ~~, ~~~ <br />~~tP 2 ~ 2~~6 <br />D `ion of Reclarnafion, <br />Mining and Sa;ety <br />Denver, Colorado 80203 ~ j// <br />Re: Climax Mine EPF Certification; Permit M-77-~9^ 3. 2-Dam Pipeline and 'I'enmile <br />Sludge Cells (AM-OS) <br />Dear Mr. Sorenson: <br />The 2-Dam Pipeline and the Sludge Cells constructed on Tenmile Tailing Impoundment <br />as part of the Climax sludge densification plant construction approved in Amendment <br />AM-OS are considered Environmental Protection Facilities. Construction of these EPFs <br />is completed. Attached is the certification signed by a professional engineer that these <br />facilities were constructed as designed. <br />If you have any questions or require additional information, please contact me at 719- <br />486-2150, ext. 723. <br />S~ ~~ <br />Gary Shfka <br />Sr. Environmental Engineer <br />Climax Molybdenum Company, Climax Mine <br />Cc: J. Cupp, w/o attach <br />A. Hardy, w/o attach <br />