Laserfiche WebLink
Reclamation Bond <br />Task # Description Time Cost <br /> (days) <br />1 Spread overburden on Phases A4 and B4 for reclamation 44 $32,240 <br /> from stockpile on slopes for dry rangeland. 3.63 acres <br /> (62,000 cy). Use D-8 w/universal blade. Cost is $0.52/cy. <br />2 Spread overburden on Phases A4 and B4 for reclamation 40 $38,500 <br /> from stockpile on irrigated lands. 18.25 acres (55,000 cy). <br /> Use Scraper. Cost is $0.70/cy. <br />3 Rip to a depth of 2.0 feet all areas prior to topsoiling. Cost = 4 $5,643 <br /> $250/acre for 22.57 acres <br />4 Spread topsoil on irrigated area from stockpile 18.25 acres 11 $10,850 <br /> @ 6 inches average thickness (15500 cy). Use Scraper. Cost <br /> is $0.70/cy. <br />5 Spread topsoil on dry rangeland areas from topsoil berms 12 $9,100 <br /> around the perimeter of the mine. (17500 cy). Use D-8 <br /> w/universal blade. Cost is $0.52/cy. <br />6 Final grading and harrowing of topsoil (33,000 cY @ 19 $12,540 <br /> $0.38/cy). <br />7 Seed, mulch, fertilize dry rangeland areas (3.63 acres@ 4 $2,541 <br /> $700/acre) Drill seed on flat areas. Mulch at 1.5 tons per <br /> acre. <br />8 Seed irrigated areas (18.25 acres@ $300/acre) 8 $5,475 <br />9 Unreclaimed Road Areas for irrigation Access (0.7 acres) 0 $0 <br /> Total Direct Costs 122 $111,414 <br /> DMG Costs (19.5% x direct costs) $21,726 <br /> Total Costs $133,140 <br />Haldorson Sand and Gravel Mine 50 <br />