My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2006-02-08_REVISION - M1983141
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1983141
>
2006-02-08_REVISION - M1983141
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/15/2021 5:35:53 PM
Creation date
11/21/2007 3:45:09 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1983141
IBM Index Class Name
Revision
Doc Date
2/8/2006
Doc Name
Adequacy Response Concerns Pyrsuant to Fax Dtd Feb.3 2006
From
Mount Royale Ventures LLC
To
DMG
Type & Sequence
AM2
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
17
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br /> <br />The general layout of a scope for resuming <br />mining is shown in Figure 4. The cycle of drilling, <br />blasting, mucking, pulling floor, raising chutes and <br />manways, blasting and levelling waste and laying <br />Boor is repeated on successive lifts until the next <br />level is reached. Additional service raises are driven <br />as the slope advances. Temporary pillars are left <br />where a bad hangingwall requires support. In some <br />places where the vein is over 2 ft. wide, sufficient <br />waste fill cannot be obtained from slashing the foot- <br />Mining Methods <br /> <br />--- ~-~._ <br />%~-~ ~ <br />i ~~ i <br />~.~ <br />iii" <br />;t <br />~~ <br />•~' <br />~i <br />r~~ :'°'~ <br />~ _ '.i.8' .i I <br />~.~ <br />i <br />/; <br />ar s.r <br /> <br />fiyuro 4. Sacliaa aAeriap ~/ Asap. lar nwawiq n'rp. <br />gall without making the slope excessively wide. In <br />such cases, additional waste, usually from develop- <br />ment on other levels is dumped into the scope <br />through the service raises. Sculls are placed where <br />the ground needs additional support. particularly in <br />the first two lifts above the drift back timber. <br />All slope operations are on an incentive bonus <br />system. Breaking and mucking is paid for by the <br />square foot of vertical area extracted and chute and <br />manway raising by the lift, floor laying by the square <br />foot, chute pulling and tramming by the tan. <br />Typical costs and consumption o[ major <br />supplies and materials are shown in the accompany- <br />ing table. <br />Advantages of the method ate: <br />The ore is extracted separately thus reducing <br />dilution and maintaining a high grade. <br />Scope openings are kept to an optimum <br />working width. <br />Fill is placed immediately after the extraction <br />of orc thus minimizing the sloughing of walls. The <br />fill is ordinarily obtained directly from the footwall <br />and usually no additional fill from outside has to be <br />transported into the slope. <br />\o ore is tied up as in shrinkage scopes. <br />103 <br />fipuro 3. Vtar A,rp. .4.:y lrsa~..I I~gaer>r vAer.: e«!<- <br />•~ <br />
The URL can be used to link to this page
Your browser does not support the video tag.