My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2002-07-31_REVISION - M1983033
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1983033
>
2002-07-31_REVISION - M1983033
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/15/2021 5:49:51 PM
Creation date
11/21/2007 3:44:58 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1983033
IBM Index Class Name
Revision
Doc Date
7/31/2002
Doc Name
Adequacy Response
From
Environment Inc
To
DMG
Type & Sequence
AM8
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
26
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
ALBERT FRET AND 80N 8, INC. <br />BOND EBTIMATE - EXISTINB CON DITIONB <br />JULY 26, 2002 <br />EST/MATED UN/T COSTS FOR RECLAMAT/ON /TEMS: <br />PAGE 3 <br /> Unit Cost <br />1. Revegetation includes grass seed mix, mulch, <br /> fertilizer and labor to drill $487.56/ac <br />- <br />2. Bench shaping including blasting grading and <br /> shaping D-9 cat?, push distance 100 ft or less 0.67/YD3 li <br />3. Toe elope grading and shaping D-9 cat?, <br /> push distance 100 ft or less 0.16/YD3 li <br />4. Resoiling benches, 988 Loader cat?, haul distance <br /> 1000 ft or less 0.60/YD3 li <br />5. Floor area shaping and grading, <br /> 140G motor grader cat?, $49.24/AC 1~ <br />6. Trees, includes planting costs & materials. $ 3.24/tree <br />7. Unroadable equipment and scrap removal @ 3 hr <br /> @ $20.00/hr to load and haul cost/load $200 $260.00/load <br />8. Demolition of concrete pads. $1.98/sq-ft <br />9. Secondary seeding rate of failure 258 <br /> RECLAMA710N COSTS <br />1. Revegetation, 14.19 ac @ $487.56/ac $ 7,039.09 <br />2. Bench shaping 241,618 cy @ 674/cy 160,683.01 <br />3. Toe slope shaping, 67,667 cy @164/cy 10,490.36 <br />4. Resoiling, 20,472 yd3 @ $0.60/yd3 6,295.00 <br />5. Grading mine floor 35.81 ac @ $49.24/ac 1,763.43 <br />6. Tree planting 300 trees @ $3.24/tree 972.40 <br />7. Unroadable and scrap removal, load and haul <br /> 35 loads @ $260/load 9,100.00 <br />8. Demolition of concrete pads. 270 sgft @ <br /> $1.98/sq-ft 534.60 <br />9. Reseeding costs 14.19 @ $487.65/ac * 258 1,759.77 <br /> Net Total $ 198,637.66 <br />10. Indirect costs <br /> Mobilization round trip (40 mi haul) 4,011.58 <br /> Insurance, Bond, & Profit 20,264.88 <br />11. Administration costs 10 132.44 <br /> TOTAL ESTIMATE 238,163.05 <br />RECOMMEND BOND BE SET AT 5238,200.00 <br />1/ Figured using Cat Handbook and rental coats from local sources, for <br />eastern Colorado. 838 efficiency <br />2/ This equipment is for cost estimating only and the actual equi~ent used <br />by the permittee mny vary. <br />
The URL can be used to link to this page
Your browser does not support the video tag.