My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ENFORCE37676
DRMS
>
Back File Migration
>
Enforcement
>
ENFORCE37676
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 7:46:36 PM
Creation date
11/21/2007 3:41:28 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981047
IBM Index Class Name
Enforcement
Doc Date
2/23/1982
From
WESTERN
To
MLRD
Violation No.
CV1981044
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
4
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
~'' . <br />~~ ©Q lNestern <br />~D <br />\4C SICIn ALSUGaICtl Coal Corp. <br />Supt 2300 <br />t10 Sovemrcnlh sv CCl <br />Denver, Coioiatlo 80202 <br />(303) 825 1900 <br />December 18, 1981 <br />Mr. Tom Gillis <br />Reclamation Specialist <br />Mined Land Reclamation <br />1313 Sherman Sereet <br />Denver, CO 80203 <br />Re: Blue F.ihbon Mine <br />Your File No. C-047-81 <br />Abatement for Violation 81-43 <br />Dear Tom: <br />Enclosed is a plan [n resolve the concerns of MhRD related tD drainage <br />and vegetation recently disturbed by the required access of the old Blue <br />Ribbon Mine road. <br />First, you are~advi sed that personnel changes have occurred recently. <br />Bruce Collins, formerly Rlue Ribbon r•tine Superintendent, has transferred to <br />our Delta Operations office. Joseph J. (John) Gabossi is the new super- <br />intendent effective December 15, 1981. <br />,]Dining Rrucc• in the Delt^ office is Nnrvi.n ndnm, Chief Engineer of <br />Delta Operations. t•fr. ndnm was employed in that capacity October 26, 1981. <br />h'i[h Mr. Adam responsible for engineering at both Bluc Ribbon and Grand 1.1csa, <br />it is anticipated that he will he involved he•nvil}• in permit type work. <br />ABATEMENT PLAN Foa ~ruh vlol.n•rl.or; <br />Drainage - A small herm will he constructed to ensure that drainage <br />from the recently dis[urbud l,ortion of the old R7ue Ribbon fan access road <br />will he adequately handled. rte. Adam intends to connect the drainage from <br />the o.ld access road•i.nto the new sediment r.t~nCrol system heing modified to <br />meet the current regulations. <br />1'nu sh<nlld he aware Chal the purpose. Df using thr_• old road was Co remove <br />LJIC• mine fun and properly sent Cllc old workin};s to i•nsurc proper ventilation <br />in the mine nnw heing npr rnl r_•d. "fo coinpl etc Iliiti Lurk Lhc rrl rl mine fan road <br />will be uCili-r.ed possih.ly u:ir:e more. Afler completion of the nca] and related <br />earth work, the berm construction will he completed wiCh schedule being weather <br />dependent. 'fhe mine proposes a deadline Df Ftay 15, ]98z, with an intention <br />to complete this ca r.li i•r if i;cnt her a]loa•s. <br />
The URL can be used to link to this page
Your browser does not support the video tag.