Laserfiche WebLink
DEC-17-2001 08 ~ 59 MCCLRNE CRNYON i ~ rr~ o.~o »vi ~ ~ ..~.. <br />gob azea & packed Mungea <br />gob (~ Loma <br />gob @ Loma <br />!vent tube (a3 #4 stir drain (d Hangar <br />Gar sample taken 5om pond - rcc'd dam 10/16 <br />6c loaded gob (cD Munger <br />d straw for titulching <br />pond water & ripped Bob L Loma <br />Bass & mulched below gas tank on site <br />~ s,~tnp}e tajcen from potid -recd data 24 <br />.'sedimetrt pond (with loader) <br />;.sediment. pond (withloader) <br />sdcd, fertilized 8< harrowed <br />`:compacting sample taken from Mtmget per Iim Stover <br />dad 2~. vack hoe to work on pond -still on sift ®17112/01 <br />ed to rerxive clamshell to work as pond -estimate 2 day's trse <br />igh thetc is riot an itemized listin8 for whin We txack hoes and other equipment wore tined, <br />~cied out bcades on the dates spacifi~ally shown above. <br />pmate cost of work carried oaf, not including man-bores: <br />~ S 225 <br />54,075 <br />im shap,etc. 51,500 <br />5 t340 <br />$ 570 <br />Ghce rent (~ still couming) 52,850 <br />br mulch ~ seed 51,250 <br />mtshell to clean pond 55,000 <br />from Munger S32,300 <br />Mmtger & Loma . 52,050 <br />