My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ENFORCE37635
DRMS
>
Back File Migration
>
Enforcement
>
ENFORCE37635
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 7:46:34 PM
Creation date
11/21/2007 3:40:14 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1994082
IBM Index Class Name
Enforcement
Doc Date
12/22/2003
Doc Name
Extension of Abatememt Deadline Beyond 90 days (Memo)
From
Mike Boulay
To
Ron Cattany
Violation No.
CO2003012
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
2
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
~~" <br />,.. <br />Cattany <br />Page 2 <br />December 22, 2003 <br />was issued on October 22, 2003 for failure to complete the remedial actions required to abate <br />NOV CV 2003-007. The abatement deadline for CO-2003-012 is 90 days (on or before January <br />19, 2004). <br />Since the issuance of the failure to abate cessation order, the 2001-2002 area has been rough <br />backfilled and graded. However, topsoiling and seeding activities have not been completed in ' <br />this area. Our rules require that seeding and planting of disturbed azeas shall be conducted <br />during the first normal period for favorable planting conditions afrer final preparation for seeding <br />or planting. Topsoil redistribution and seeding is generally not possible due to climatic <br />conditions during the winter months at the Yoast mine. The topsoiling would require that topsoil <br />be placed over saturated (snow covered or extremely muddy) spoil and placement by scrapers <br />under these conditions causes deep ruts and unsafe operating conditions. <br />Therefore, Rule 5.03.2 (2)(c)(iv) applies as follows: "Where climatic conditions preclude <br />abatement within 90 days, or where, due to climatic conditions, abatement within 90 days clearly <br />would cause more environmental harm than it would prevent..." SCC believes that attempting to <br />place topsoil over snow covered saturated regazded spoil would cause more harm. The operator <br />has requested an extension to the abatement date be granted for topsoiling, seeding, and postmine <br />chanttel construction activities until climatic conditions improve. <br />I am requesting that the abatement deadline for CO-2003-012 be extended to April 18, 2004. <br />Please see the attached Extension of Time for Abatement Notice. <br />Please let me know if you have any questions, or require additional information. <br />c: Sandy Brown <br />David Berry <br />Enclosure <br />
The URL can be used to link to this page
Your browser does not support the video tag.