My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2003-05-12_REVISION - M1985184
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1985184
>
2003-05-12_REVISION - M1985184
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/16/2021 5:56:53 PM
Creation date
11/21/2007 3:39:46 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1985184
IBM Index Class Name
Revision
Doc Date
5/12/2003
Doc Name
Technical Revision
From
Killion Enterprises LLC
To
DMG
Type & Sequence
TR1
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
2
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
RECEIVED <br />MAY 1 2 2003 ~ <br />Division ~f Minerals and Geology <br />May 5, 2003 <br />Colorado Division of Minerals and Geology <br />Department of Natural Resources <br />1313 Sherman Street, Room 215 <br />Denver, CO 80203-2273 <br />RE: Technical Revision for Permit ID # M-1985 184 ~ <br />(Site inspected by Erica Crosby on 3/13/03) <br />To Whom It May Concern: <br />~~~io~v <br />E/VTERPR/SES, LLC <br />862 W. Willox Ln. <br />Fort Collins, CO 80524 <br />Phone (970) 482-0358 <br />FAX (970) 221-1626 <br /> <br />We would like submit a technical revision and advise the Division of Minerals and <br />Geology, that along with our regulaz mining activity, we are also storing concrete, <br />asphalt, topsoil and fill dirt that we crush and/or recycle into reusable products. On <br />average we store 20,000 cubic yards of concrete, 5,000 cubic yards of asphalt, 1,500 <br />cubic yards of topsoil and 2,000 cubic yazds of fill dirt. (All totals include processed and <br />unprocessed material). The original materials aze hauled in from excavation sites azound <br />Fort Collins. The finished products are sold and hauled away. Any unusable material <br />(wood, metal, etc.) is hauled away to metal recycling facilities and landfills. <br />We aze currently evaluating different areas of our site that may be ready for reclamation. <br />We are aware that no wood or metal may be used in the reclamation process and we will <br />not use any such materials for that purpose. We will contact the Division of Minerals and <br />Geology when any portions of our site aze reclaimed in case another inspection needs to <br />be scheduled. <br />Please contact us if more information is needed for revision. <br />Thank YJonur, <br />1' /~- <br />Ja ~ Killion <br />~~U <br />Enclosure (1) Cl~tk~ y389 <br />
The URL can be used to link to this page
Your browser does not support the video tag.