Laserfiche WebLink
CIRCES Cost Estimating Software <br />PROJECT IDENTIFICATION <br />Task # : 005 State :Colorado Permit/job# : M-1980-170 <br />Date : 07/12/2006 County :Ouray Abbreviation :none <br />r: KAP <br />U Site :Bachelor Mine (Syracuse Pon Filename:M170-005 <br />se <br />Agency or organization name :Colorado Division Of Minerals And Geology <br />Permit or other job action :Bond Recalculation related to Inspection <br />Task description :Spread soil and/or fines on area to be seeded <br />HOURLY EQUIPMENT COST <br /> Basic machine : Caf D7R DS Series 1/- 7SU Horsepower : 240 <br /> Blade type : Semi-Universal <br /> Attachment no. 1 : BOPS Cah Shift basis : 1 per day <br /> Attachment no. 2 : 3-shank ripper <br /> Data source : (CRG) <br /> Utilization <br />Cost Breakdown : Ownership cost/hour : $43.17 NA <br /> Operating cosUhcur : $55.05 100 <br /> Ripper op.cosUhour : $0.00 0 <br /> Operator cost/hour : $32.53 NA <br /> Total unit cosUhour : $130.76 Total fleet cosUhour : $130.76 <br /> <br />MATERIAL QUANTITIES <br />Initial Swell Loose <br />volume : 627 LCY factor : NA volume : 627 LCY <br /> <br />Source of estimated volume :11/01 inspection, permit map, 4"avg. depth <br />Source of estimated swell factor : NA <br />HOURLY PRODUCTION Job~Condition Correction Factors Source ~~~ <br /> Operator skill : 0.75 (avg.) <br />Average push distance : 100 feet Material consistency : 1.10 (Cat HB) <br />Unadjusted hourly production : 714.3 LCY/hr Dozing method : 1.00 (gen.) <br /> Visibility : 1.00 (avg.) <br />Material consistency description : Job efficiency : 0.83 (1shiWday) <br />Partly consolidated stockpile Spoil pile : 0.80 (fnd-rf) <br /> Push gradient : 1.00 (Cat HB) <br />Average push gradient : 0.00 % (neg) Altitude : 0.93 (Cat HB) <br />Average site altitude : 8,050 feet I Material weight : 0.90 (Cat HB) <br /> Blade type : 1.00 (S/SU/U) <br />Material weight 550 Ibs/LCY <br />: 2 Net correction : 0.46 <br /> , <br />Weight description <br />Earth -Dry packed Adjusted unit production : 327.76 LCY/hr <br /> Adjusted fleet production : 327.76 LCY/hr <br />JOB TIME AND COST <br />Fleet size : 1 Dozers) Total job time : 1.91 Hours <br />Unit cost : $0.399 /LCY Total jab cost : $250 <br />