My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2006-07-17_REVISION - M1980170
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1980170
>
2006-07-17_REVISION - M1980170
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/15/2021 11:44:39 AM
Creation date
11/21/2007 3:39:35 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1980170
IBM Index Class Name
Revision
Doc Date
7/17/2006
Doc Name
Bond Recalculation related to Inspection
From
DMG
To
File
Type & Sequence
SI2
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
10
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CIRCES Cost Estimating Software <br />PROJECT IDENTIFICATION <br />Task # : 002 <br />Date : 07/12/2006 <br />User : KAP <br />State :Colorado <br />PermiUjob # : M-1980-170 <br />County:6a-Rleta pc,,r~y Abbreviation :none <br />Site :BachelorMlne (Syracuse Porte Filename :M170-002 <br />Agency or organization name :Colorado Division Of Minerals And <br />Permit or other job action :Bond Recalculation related to Insp~ <br />Task description :Pull steep dump slope material up, to be <br />HOURLY EQUIPMENT COST <br />Horsepower: 110 <br />Weight (MT) : 16.90 <br />Cost Breakdown : Utilization <br />Ownership cosUhour : $21.20 NA Shift basis : 1 per day <br />Operating cosUhour : $25.27 100 Data source : (CRG) <br />Operator cosUhour : $32.72 NA <br />Total unit cosUhour : $79.18 Total fleet cosUhour : $79,18 <br />MATERIAL QUANTITIES <br />Initial Swell Loose . <br />volume : 1,366 CCY factor : 1.215 volume : 1,660 LCY <br />Source of estimated volume :11/01 inspec. permit <br />Source of estimated swell factor :Cat Handbook <br />HOURLY PRODUCTION <br />Excavator Cvcle Time (load bucket swing loaded dump bucket swing emote) <br />Basic job condition description : AVERAGE <br />Secondary job condition within basic description : AVERAGE <br />Cycle time value : 0.26 minutes <br />Bucket Capacity <br />Rated bucket capacity <br />Bucket fill factor <br />Adjusted bucket capacity <br />Machine description :Cat 315C L <br />0.77 LCY (heaped) Bucket size class : medium <br />1.10 USER-PROVIDED BUCKET FILL FACTOR <br />0.85 LCY <br />Fleet size : 1 excavator(s) Total job time : 11.19 hours <br />Unit cost : $0.534 per LCY Total job cost : $886 <br />
The URL can be used to link to this page
Your browser does not support the video tag.