Laserfiche WebLink
ROADABLE EQUIPMENT sheet 2 of 2 <br />Nearest major city or town within project area region <br />Transportation Cvcle Time : Non- Total one-way travel distance <br />Roadable Roadable Average travel speed <br />Haul time (hours) = 0.78 0.78 <br />Return time (hours) = 0.78 0.78 <br />Loading time (hours) = 0.50 NA <br />Unloading time (hours) = 0.50 NA <br />Subtotals = 2.56 1.56 <br />Total non-roadable mob/demob cost * <br />iw0 round trips with haul rig <br />Total roadable mob/demob cost ** <br />"one round trip, no haul rig <br />Montrose <br />35.0 miles <br />45.0 mph <br />$1,777.89 <br />$0.00 <br />JO13 TIME AND COST Total job time : 5.11 hours <br />Total job cost: $1,778 <br />EQUIPMENT HAUL DISTANCE and TIME <br />