Laserfiche WebLink
June 24, 2003 -iv- 003-2203.7 <br />Drawing 14 <br />Drawing 17 <br />Drawing IS <br />Drawing i9 <br />Drawing 20 <br />Drawing 21 <br />Drawing 22 <br />Drawing 23 <br />Drawing 23a <br />Drawing 24 <br />Drawing 25 <br />Drawing 26 <br />Drawing 27 <br />Phase N Leak Detection and Erosion Control Details <br />Phase N VLF Sections and Details <br />Phase N PSSA Bottom Geosynthetics Layout and Details <br />Phase N PSSA Top Geosynthetics Layout and Details <br />Phase N PSSA Sections and Details <br />Phase N Ore Storage Area Grading Plan and Geosynthetics Layout Near PSSA <br />Phase N PSSA Solution Recovery Sump Plan and Sections <br />Phase N PSSA Riser Section and Details <br />Riser Pipe Details <br />Phase N High Volume Solution Collection Details <br />Phase N Low Volume Solution Collection Details <br />Phase N PSSA Sections <br />Phase N Carlton Mill Demolition <br />LIST OF APPENDICES <br />Appendix A Record (As-built) Drawings <br />Record Drawing No. 1 General Composite Overview <br />Record Drawing No. 2 Primary, Secondary, and Tertiary Underdrain As-bunts <br />Record Drawing No. 3 Top of Soil Liner Fill As-built <br />Record Drawing No. 4 Leak Detection Trench As-built <br />Record Drawing No. 5 Bedding Fill As-built <br />Record Drawing No. 6 Geomembrane Record Drawing: PSSA Lower Geomembrane <br />Record Drawing No. 7 Geomembrane Record Drawing: PSSA Upper Geomembrane <br />Record Drawing No. 8 Low Volume Solution Collection As-built <br />Record Drawing No. 9 High Volume Solution Collection As-built <br />Appendix B Photographic Documentation <br />Appendix B-1 Photograph Log <br />Appendix B-2 Documentary Photographs <br />Appendix C Staff Schedule for Golder Personnel <br />Appendix D Weekly Reports <br />Appendix E Specifications <br />Appendix F Surveyor's Certificate <br />Appendix G Subgrade Acceptance Forms <br />Appendix G-1 Lower Liner Subgrade Acceptance Forms <br />Appendix G-2 Upper Liner Subgrade Acceptance Forms <br />Appendix H Concrete Observation and Testing Results <br />Appendix I CQA Laboratory Test Results <br />Appendix I-1 Grain Size Distribution, Moisture Content and Atterberg Limits <br />Appendix I-2 Compaction Tests <br />Appendix I-3 Soil Liner Fill Permeability Tests <br />Appendix J Geomembrane Quality Control Documents and Inventory <br />Appendix J-1 Geomembrane Inventory Control <br />Appendix J-2 Resumes of Installation Personnel <br />Appendix J-3 Geomembrane Resin Quality Control Certificates <br />Appendix J-4 Geomembrane Roll Quality Control Certificates <br />Appendix J-5 Welding Rod Quality Control Certificates <br />. Appendix J-6 Geotextile Roll Quality Control Certificates <br />Appendix J-7 HDPE Pipe Certifications <br />I:\oo@2W\woa\FOICertPS5A06oAOO3u03.o40o.o)JgRep.dac Goider Associates <br />