My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ENFORCE37609
DRMS
>
Back File Migration
>
Enforcement
>
ENFORCE37609
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 7:46:33 PM
Creation date
11/21/2007 3:39:17 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981025
IBM Index Class Name
Enforcement
Doc Date
6/7/1985
Doc Name
NOV C-85-037 PN C-025-81
From
MLRD
To
SNOWMASS COAL CO
Violation No.
CV1985037
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
2
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Richard D. Lamm <br />Governor <br />• <br />DEPARTMENT OF NATURAL RESOURCES <br />David H. Ge~ches, Eaecutne Director <br />MINED LAND RECLAMATION DID <br />DAVID C. SHELTDN, Director <br />June 7, 1985 <br />Mr. Scott Jones <br />Environmental Engineer <br />Snowmass Coal Company <br />P.O. Box 980 <br />Carbondale, Colorado 81623 <br />RE: NOV-C-85-037, Permit No. C-025-81 <br />Dear Mr. Jones: <br />The Division has received your request for vacation of the above referenced <br />NOV. This request was discussed with Dave Shelton, the director of the <br />Division. During this discussion, several questions arose, as detailed below, <br />which need to be clarified before a decision on your request can be made. <br />1. Is the material on the outslope above the third bench topsoil? And <br />if so, what measures does Snowmass intend to take to insure it's <br />approved final placement on top of the non-toxic cover material? <br />2. Is the outslope above this third bench so constructed as to allow <br />for placement of the required four feet of non-toxic cover while <br />still allowing the 20' wide bench? <br />3. Why was the bench seeded prior to placement of the four feet of <br />non-toxic cover. What methods will be used to insure that the <br />existing organic material is not covered with the remaining <br />material required to create the 4' of non-toxic cover. The concern <br />is for stability of material placed over organics. <br />Your timely response to these concerns is requested in order to facilitate <br />processing of your request and final resolution of the concern. <br />Si rely, <br />andace M. Thompson <br />Hydrologist <br />CMT/sjv <br />1115E <br />423 Centennial Building, 1313 Sherman Street Denver, Colorado 80203 Tel. (303) 866-3567 <br />• iii iiiiiiiiiiiii iii <br />
The URL can be used to link to this page
Your browser does not support the video tag.