My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ENFORCE37590
DRMS
>
Back File Migration
>
Enforcement
>
ENFORCE37590
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 7:46:32 PM
Creation date
11/21/2007 3:38:49 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1977378
IBM Index Class Name
Enforcement
Doc Date
11/17/2003
Doc Name
Consent Decree 94CV5459
From
Gold King Mines Corp.
To
DMG
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
15
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Koehler Tunnel Bulkhead <br />Certification Report <br />Page 3 <br />Construction of concrete forms and erection of rebar cases <br />The forms were constructed of vertical 8"x8" S4S posts and horizontal 2"x12" and 2"x6" <br />S4S lagging. The form interior was lined with'/4" plywood for additional strength. <br />Bracing consisted of angle iron and pipe anchored to the ribs, sill and back of the drift. <br />The form construction and bracing was adequate to prevent movement or failure during <br />filling of the forms. <br />The rebar cages were supported by dowels (rebar) grouted into the rib. The upstream <br />rebar cage is #6 bars on a 12"x12" grid and the downstream rebar cage is #10 bars on a <br />14"x 14" grid. The minimum clear distance from the form to the rebar is 3.5". The <br />minimum bulkhead length was specified to be 12' and the actual length was 12'. Trim <br />bars (5' long) were placed at 45° to the rebar around the cutouts in the rebar cage for the <br />pipe. All minimum clearances, dimensions and spacings met design criteria and were <br />inspected by the design engineer prior to filling of the forms. <br />Perimeter area irregularity <br />The rock contact perimeter area irregularity required to develop the design compressive <br />strength of the concrete when subject to the maximum design thrust was determined to <br />require a projection of 0.14" or more. Quantification of a minimum perimeter area <br />irregularity was not specifically calculated due to the blocky irregularity on the back, ribs <br />and floor extending more than 1 ft. into the tunnel cross section. <br />Pumpins of concrete, fillinE of forms and concrete compressive strength <br />The following concrete mix was used for this bulkhead. <br />The concrete mix was as follows: <br />#/cu. vd. <br />Portland Type V 720 <br />Sand 1692 <br />Fine Aggregate - 3/8" 1093 <br />Fly Ash, Class F 115 <br />Water 324 <br />Delay Set <br />The concrete was batched from the portable Sandco batch plant that was set up in <br />Silverton. This is the same plant and concrete supplier used for the American Tunnel <br />
The URL can be used to link to this page
Your browser does not support the video tag.