Laserfiche WebLink
<br />Page 2 <br />Mr. Joseph Dudash <br />July 2, 1993 <br />C-93-039 A culvert has been installed i <br />spillage east of the silos has been cleaned. <br />contaminated soil have been placed in drums. <br />submitted to the processor for evaluation and <br />for shipping. Cleaning of the windblown coal <br />All cleanup work is continuing. <br />n D11. Coal <br />Spilled oil and <br />Samples have been <br />directions to BRI <br />is in progress. <br />C-93-040 A contractor has been retained and is removing <br />scrap from the warehouse area. Most other sites.haye been <br />cleaned and reclamation has been initiated for certain other <br />areas. Most of the noncoal waste at the disposal area has been <br />covered with a dirt layer. Cleanup of waste in D28 will be done <br />during this period. <br />For July 15 Abatement: <br />C-93-041 Coal slurry has been removed from terraces and <br />outslopes and the areas reseeded. Fihal cleaning of the Gabion <br />baskets on the top bench will be completed. <br />C-93-058 Spillage from refuse conveyor has been cleaned as <br />have the drip pans. Disturbed material outside sediment control <br />along various ditches is being removed. Windblown coal in the <br />buffer zone is being removed. <br />C-93-062 Road ditches are nearly completed (see 036). <br />Revisions have been submitted to the Division. <br />If you have any questions, please contact me at (719) 8.68- <br />2761, Extension 107. <br />Sincerely, <br />~~~~~ , <br />l~c~ Thom s n <br />Senior Mine E sneer <br />RGT/bb <br />