Laserfiche WebLink
50 MIL HOPE <br />LINER — <br />6' :E (NEW r� i <br />OR KLUDCATED) <br />UP -SLOPE ANCHOR EXISTING GROUND CREST ANCHORe <br />TRENCH e NEW 60-MIL HOPE LINER SURFACE NEW 60 -MIL HOPE TRENCH <br />- -- _ OVER GCL COMPOSITE LINER LINER OVER GCL EMBANKMENT RAISE <br />SIMILAR CREST EL. 8420 ENLISTING POWER <br />-_ -_ COMPOSITE LINER <br />-_____ EXISTING HOPE POLES (00 NOT <br />LINER DISTURB) <br />---- - - - - -- - TRENCH. SEE 7 4 (REMOVE g <br />DETAIL 4 BIAL REPLACE) <br />F <�.. <br />GEOGRID <br />- -' - - "" S \\ 5' J1 2 TERRACE EXISTING <br />to N's __ EMBANKMENT AS <br />FOR TYPICAL LINER 6 .�.��� -� NECESSARY EXISTING <br />SECTION SEE DETAIL - " "'- - <br />- -- ...."."'-.....•- -,___, �, i GROUND <br />LEAVE EXISTING N "s _ - -_ rBU i� <br />EXCAVATION EXISTING <br />NATIVE SOIL AS ' <br />1MTERIAL TAILINGS CONTAINMENT ESTIMATED - -- •`^-^ - - EMBANKMENT <br />BERM (APPROX. 5' HIGH) BEDROCK `'"""'^-- CREST EL. 8409 2 <br />SURFACE \ <br />TO <br />TAIUNGS POND EXPANSION <br />CONSTRUCTION DETAIL 1 <br />awa C4 <br />ANCHOR TRENCH r 6" ROAD WEARING SAFETY BERM I® M Imo•• w j <br />BACKFILL� 1 COURSE <br />371 SLOPE u! EXISTING GROUND <br />y - SURFACE <br />RANDOM FILL 2 <br />1 '^ 1 - - - - - - - <br />(SEE NOTE 1) <br />1.5 1,5 <br />NOTESi <br />1. RANDOM FILL CONSISTS OF BORROW MATERIAL GENERATED FROM POND <br />EXCAVATION. URGE ROCK FRAGMENTS AND BOULDERS THAT ARE GREATER <br />THAN 6' IN DIAMETER SHALL BE GRADED TO THE DOWNSTREAM FACE. <br />FINER GRAIN MATERIAL SHALL BE PLACED IN THE UPSTREAM ZONE OF THE <br />EMBANKMENT. <br />2. ALL FILL PLACED SHALL BE COMPACTED TO 90X OF MAX. DRY DENSITY, <br />AS DETERMINED BY ASTM D -1557. <br />NOTES <br />1. CAST EXCAVATED SPOIL TO OOWNSLOPE SIDE OF DITCH, SHAPE COMPACT <br />AND TRIM TO CONFIGURATION SHOWN. <br />2. SLOPE OF DITCH TO BE MAINTAINED AT NO GREATER THAN 24. <br />3. HAY BALES SWILL BE PLACED PERIODICALLY ALONG DITCH LENGTH AND AT <br />THE DITCH OUTLET FOR SEDIMENT CONTROL. <br />V —NOTCH DRAINAGE DITCH <br />C4 <br />o a sacr <br />7��60 MIL HOPE LINER <br />_!& SAND LEVELING LAYER <br />/ �(AS NECESSARY) <br />%BEDROCK <br />TYPICAL UNER SECTION <br />NOT TO SCALE C4 <br />EXISTING TAILINGS <br />TO REMAIN IN <br />PUCE <br />LUG 5 M8 <br />DIV. <br />8 <br />A90103C d <br />S1V83NIA 90 A10 <br />CONSTRUCTION SEQUENCE <br />01 REMOVE THE EXPOSED LINER LOCATED ON THE NORTH BANK OF THE EXISTING <br />POND AND THE FENCE SURROUNDING THE POND. <br />® PLACE A BIAXIAL GEOGRID OVER THE EXISTING TAILINGS WHICH ARE TO BE <br />COVERED BY THE EMBANKMENT EXTENSION /RAISE. TERRACE THE DOWNSTREAM <br />SLOPE OF THE EXISTING EMBARKMENT AS NECESSARY TO PROVIDE SUITABLE <br />SURFACE FOR PLACEMENT AND COMPACTION OF MATERIAL. <br />Q EXCAVATE THE MATERIAL NORTH OF THE EXISTING POND TO THE CONTOUR <br />SHOWN ON DRAWING 5461 -C2. LEAVE AN INTERIM CONTAINMENT BERM BETWEEN <br />THE NEW EXCAVATION AND THE EXISTING TAILINGS POND. SECURE EDGE OF <br />EXISTING LINER IN INTERIM ANCHOR TRENCH. <br />Q PLACE AND COMPACT THE EXCAVATED MATERIAL TO FORM THE EMBANKMENT <br />EXTENSION. TERRACE THE DOWNSTREAM SLOPE OF THE EXISTING EMBANKMENT <br />AS NECESSARY TO PROPERLY PLACE AND COMPACT THE NEW EMBANKMENT <br />MATERIAL. <br />® INSTALL THE NEW 60 -MIL HOPE LINER AND GCL IN THE NEWLY EXCAVATED <br />PORTION OF THE POND FROM THE UP -SLOPE ANCHOR TRENCH TO THE <br />CONTAINMENT BERM. TEMPORARILY ANCHOR THE LINER AND GCL AT THE <br />CONTAINMENT BERM USING SAND BAGS. <br />® RELOCATE THE EXISTING TAILINGS WHICH ARE NOT LOCATED UNDERNEATH THE <br />EMBANKMENT EXTENSION INTO THE NEWLY LINED PORTION OF THE POND. <br />8 CONTINUE INSTALLING THE NEW LINER AND GCL FROM THE CONTAINMENT BERM. <br />ACROSS THE EXISTING POND, AND UP THE NEW EMBANKMENT EXTENSION TO THE <br />CREST ANCHOR TRENCH. <br />® PUCE FENCE AROUND POND PERIMETER AND EMBANKMENT CREST. <br />DIn <br />PRM <br />BY: LCO <br />I BY. — <br />I�ii11111NIpOgIIIN�I� „RIIII!IIIAI <br />0017750 <br />POND DEWLS <br />TAIUNGS POND CREST <br />GEOMEMBRANE /GCL <br />ANCHOR TRENCH <br />%2, <br />rrt <br />C4 <br />• o • <br />rm <br />WELD PHASE 2 OF NEW <br />SECURE GCL IN ANCHOR <br />LINER TO PHASE 1 OF NEW <br />TYP <br />TRENCH BEFORE INSTALLING <br />LINER ALONG UPSTREAM <br />PHASE 2 LINER <br />CREST OF INTERIM BERM <br />1' <br />INTERIM <br />NEW 60 MIL NOPE POND <br />- . <br />- CONTAINMENT <br />BERM <br />LINER. SEE NOTE 5O <br />• \\ <br />\/ <br />NEW 50 MIL NDP <br />LINER SEE NOTEU7 <br />NEW GCL. - <br />/� <br />�� <br />SEE NOTEQ� <br />%T <br />NEW GCL. SEE NOTEO7 <br />EXISTING HOPE POND <br />COMPACTED \� <br />LINER <br />BACKF1U. <br />\ <br />INTERIM ANCHOR TRENCH @4 <br />NOT TO SCALE <br />C4 <br />V —NOTCH DRAINAGE DITCH <br />C4 <br />o a sacr <br />7��60 MIL HOPE LINER <br />_!& SAND LEVELING LAYER <br />/ �(AS NECESSARY) <br />%BEDROCK <br />TYPICAL UNER SECTION <br />NOT TO SCALE C4 <br />EXISTING TAILINGS <br />TO REMAIN IN <br />PUCE <br />LUG 5 M8 <br />DIV. <br />8 <br />A90103C d <br />S1V83NIA 90 A10 <br />CONSTRUCTION SEQUENCE <br />01 REMOVE THE EXPOSED LINER LOCATED ON THE NORTH BANK OF THE EXISTING <br />POND AND THE FENCE SURROUNDING THE POND. <br />® PLACE A BIAXIAL GEOGRID OVER THE EXISTING TAILINGS WHICH ARE TO BE <br />COVERED BY THE EMBANKMENT EXTENSION /RAISE. TERRACE THE DOWNSTREAM <br />SLOPE OF THE EXISTING EMBARKMENT AS NECESSARY TO PROVIDE SUITABLE <br />SURFACE FOR PLACEMENT AND COMPACTION OF MATERIAL. <br />Q EXCAVATE THE MATERIAL NORTH OF THE EXISTING POND TO THE CONTOUR <br />SHOWN ON DRAWING 5461 -C2. LEAVE AN INTERIM CONTAINMENT BERM BETWEEN <br />THE NEW EXCAVATION AND THE EXISTING TAILINGS POND. SECURE EDGE OF <br />EXISTING LINER IN INTERIM ANCHOR TRENCH. <br />Q PLACE AND COMPACT THE EXCAVATED MATERIAL TO FORM THE EMBANKMENT <br />EXTENSION. TERRACE THE DOWNSTREAM SLOPE OF THE EXISTING EMBANKMENT <br />AS NECESSARY TO PROPERLY PLACE AND COMPACT THE NEW EMBANKMENT <br />MATERIAL. <br />® INSTALL THE NEW 60 -MIL HOPE LINER AND GCL IN THE NEWLY EXCAVATED <br />PORTION OF THE POND FROM THE UP -SLOPE ANCHOR TRENCH TO THE <br />CONTAINMENT BERM. TEMPORARILY ANCHOR THE LINER AND GCL AT THE <br />CONTAINMENT BERM USING SAND BAGS. <br />® RELOCATE THE EXISTING TAILINGS WHICH ARE NOT LOCATED UNDERNEATH THE <br />EMBANKMENT EXTENSION INTO THE NEWLY LINED PORTION OF THE POND. <br />8 CONTINUE INSTALLING THE NEW LINER AND GCL FROM THE CONTAINMENT BERM. <br />ACROSS THE EXISTING POND, AND UP THE NEW EMBANKMENT EXTENSION TO THE <br />CREST ANCHOR TRENCH. <br />® PUCE FENCE AROUND POND PERIMETER AND EMBANKMENT CREST. <br />DIn <br />PRM <br />BY: LCO <br />I BY. — <br />I�ii11111NIpOgIIIN�I� „RIIII!IIIAI <br />0017750 <br />POND DEWLS <br />