Laserfiche WebLink
.. <br /> <br />lower than anticipated. MCC may desire to revise the elevation of <br />the bench to excavate to competent bedrock. In the event this were <br />done, the cutslope southeast of the collar would be increased in <br />height by 25 feet, to approximately 50 feet. A 50 foot high <br />cutslope in colluvium will require geotechnical evaluation to <br />support design of a stable slope configuration. (ACC She..l~( ho'~ <br />e,~t -I~,S 51o~e u-,J~d~x~~ ~e1.Q skti,~;!!mil ol- Gti ,~~~,,°~,,s.f{ r-v~;s,a.,, <br />0 1 L P,.;.r <br />UM °l Su.vJtZ~r/?2~~1 (~`~~fowt.l ~°'"' ~ (~~6'. <br />