Laserfiche WebLink
GEOSYSTEM SLOPE STABILITY PROGRAM <br />SB-SLOPE <br />PROJECT DATA: <br />Prpject: FORT LJPTON PIT <br />,ocation: PnAS~ I CELL 2 <br />ri_ename: P1-C2 Description: <br />ANALYSIS DATA: <br />Point Coordinates <br />No. X Y <br />1 0.0 36 <br />2 82.0 36 <br />3 0.0 32 <br />4 84.0 32 <br />= 0.0 25 <br />6 23.0 25 <br />7 48.0 23 <br />8 68.0 21 <br />9 78.0 19 <br />10 88.0 16 <br />11 93.0 10 <br />12 96.0 8 <br />13 0.0 c_ <br />1"_ 98.0 4 <br />15 0.0 0 <br />16 100.0 0 <br /> Line Left Riaht Soil Phreatic Soil Density Cohesion Phi <br /> No. Point Point No. Lire No. pcf psf Dec <br />0 1 1 2 1 N "_ 90.0 a 34. <br />0 2 3 4 2 N 2 130.0 0 35. <br />0 3 5 5 3 Y 3 137.0 0 35. <br />0 4 6 7 3 Y 4 142.0 0 14. <br />9 5 7 8 3 Y 5 150.0 500 25. <br />0 6 8 9 3 Y <br />5 7 9 10 3 Y <br />5 8 10 11 3 Y <br />8 9 11 12 3 Y <br />2 10 13 14 4 N <br />9 11 15 16 5 N <br />0 12 14 16 4 N <br />0 13 12 14 3 N <br />0 14 4 12 2 N <br />0 15 2 4 1 N <br />0 <br />