Laserfiche WebLink
~ ~ III IIIIIIIIIIIIIIII <br />999 <br />STATE OF COLORADO <br />DIVISION OF MINERALS AND GEOLOGY <br />Deparimem of Nalu ral Resource <br />111 } Sherman 51 ., Koom 215 <br />Deme~. Giluradu k0203 <br />Phony: 1 HI 41 Hfi6-}5(i) <br />FAX' UO it fl} r g I Ufi <br />November 14, 1996 <br />II~~~ <br />DEPARTMENT OF <br />NATURAL <br />RESOURCES <br />Roy Romei <br />Cmemo~ <br />Mr. Mike Ossola, County Planner i,mres ~„~nnr,~~ <br />Las Animas County e."~°"°e D.".~'°' <br />200 East 1st, Rm 104 n,~~n,ele w~~; <br />on•i5ion o~~rc~~, <br />Trinidad, CO 81082-0000 <br />RE: Las Animas County (Airport) Gravel Pit (Permit M-83-039) Change <br />in correction action date for Compliance Problem and in hearing <br />date for Possible Violation. <br />Dear Mr. Ossola: <br />As a result of the County's request for additional time to complete <br />a survey of the boundaries of the Airport Pit, which is the basis <br />for satisfying Compliance Problem 1 identified during the <br />Division's inspection on 10/31/96, the correction action date for <br />this Compliance Problem is changed from 12/01/96 to 1/1/97. <br />Since the survey, the marking of the boundaries of the permit area <br />as a result of the survey and the preparation of a map, based on <br />the survey and accurately illustrating the size and shape of the <br />permit area as well as any current mining related disturbance <br />outside of the permit area, will apparently not be able to be <br />completed until mid-December, the matter of a possible violation <br />for failure to protect areas outside of the affected land from <br />damage during the mining operation will be continued from the <br />December 18-19, 1996 meeting of the Board until the January 22-23, <br />1997 meeting. <br />If you have any questions on the above, please contact me. <br />Sincerely, <br />James C. Stevens <br />Sr. Specialist <br />96N0165 <br />