My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ENFORCE37487
DRMS
>
Back File Migration
>
Enforcement
>
ENFORCE37487
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 7:46:28 PM
Creation date
11/21/2007 3:34:48 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1980007
IBM Index Class Name
Enforcement
Doc Date
10/14/1993
Doc Name
PHONE CONVERSATION /USFS
From
DMG
To
NOV C-93-112 FN C-80-007
Violation No.
CV1993114
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
Page 1 of 1
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
uii iiiiiiiiiiiu iii <br />999 <br />DIVISION OF MINERALS AND GEOLOGY <br />Department o(Nalural Resources <br />1317 Sherman 51., Room 215 <br />Denver, CO 80207 <br />Phone: 13071 866-1567 <br />FAX: 13031 8328106 <br />STATE OF COLORADO <br />DATE: October 14, 1993 <br />TO: NOV C-93-112; File No. C -007 <br />FROM: Christine Johnato <br />RE: Phone conversation <br />oe cow <br />~c : r <br />r~ <br />••~ <br />Roy Romer <br />Governor <br />Michael B Long <br />Din sion Director <br />I called Mike Ward with the USFS in Paonia on October 13, 1993, to find out how <br />or what part they play in regulation of a coal mine. He said the USFS first does <br />a Leasing Suitability Criteria and gives consent to lease the coal and then the <br />BLM auctions off the lease. The lease ie then obtained by the company who then <br />submits an application to DMG and OSM. The Forest Service also receives a copy <br />of the application. They also receive all revieione regarding any changes on <br />USFS land. Mr. Ward stated that they are concerned with subsidence impacts and <br />access for drilling projects. Mr. Ward believes that the Forest Service has been <br />regularly noticed of any activity at the West Elk Mine. <br />In some of the correspondence with the Forest Service, I found that the USFS had <br />stated that they concur with the mine application. I asked him what they meant. <br />He said basically, they have reviewed the application (in this case an <br />application for two different permit revieione) and recommends that the <br />application be approved. i also asked Mr. Ward when the USFS would issue a <br />special use permit. He said a special use permit would be issued if they wanted <br />to install something that varies from the normal activities associated with coal <br />mining. For example, if they wanted to build a radio tower, a special use permit <br />would be issued. For roads outside the permit area, a road-use permit would be <br />issued. Right-of-entry is synonymous with road use permit. The permits usually <br />last ae long ae the project. They do not issue any sort of permit for road use <br />if they will be using the roads to access subsidence or hydrologic monitoring <br />sites. <br />I called Mr. Ward back on October 14, 1993 to ask him if HCC does utilize the <br />USFS roads, who ie responsible for maintenance. He said for special projects, <br />i.e., drilling, a road use permit is issued and road maintenance ie included. <br />For monitoring, the USFS does not require MCC to maintain the roads. The Forest <br />Service maintains some roads every year, others less often. He said that they <br />are not too concerned about MCC'9 use of the roads because they are using light- <br />weight vehicles which will not damage the roads. I also asked him to•FAX us the <br />letter he writes to MCC and he said he would. (MCC has asked the USFS to write <br />a letter stating they are satisfied with the notice they have received.) <br />Mr. Ward called me back later on the 14th, to make sure that the letter he was <br />writing would not jeopardize any relationships. I said no, that if the USFS felt <br />comfortable with the notice from West Elk, that we would not have any problems. <br />MCC had sent him a copy of the rule 4.20.2, and I suggested that he address each <br />of the requirements in hie letter with dates of notification if possible. <br />007NOV.PH2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.