Laserfiche WebLink
III IIIIIIIIIIIIIIII <br />999 <br />COST BUMMARY <br />EMERGENCY RESPONSE <br />NOTICE OF VIOLATION NO. C-93-143 <br />Equipment and Labor: <br />1. <br />2. <br />3. <br />4. <br />5. <br />6. <br />770-B Dragline -222.75 hr. @ $159.90/hr. <br />$35,617.73 <br />180.63 <br />86.13 <br />5,094.10 <br />10,138.40 <br />12,748.80 <br />D5H Dozer - 4.25 hr. @ $ 42.50/hr. <br />Whee l Loader - 1.25 hr. @ $ 68.90/hr. <br />D9L Dozer -105.25 hr. @ $ 48.40/hr. <br />D10N Dozer -218.50 hr. @ $ 46.40/hr. <br />D9N Dozer -192.00 hr. @ $ 66.40/hr. <br />Total <br />NOTES: <br />1 <br />Yards of Backfill Material: <br />$63,865.79 <br />- 770-B Dragline = 122,105 <br />- Dozers = 33,230 <br />2. <br />20,000 tons of coal were covered in the process of <br />stabilizing the slide area and may be lost. <br />3. The 770-B Dragline and Dozers worked from 8:00 a.m. on <br />October 18, 1993 to 10:00 p.m. on October 26, 1993 to <br />Backfill and stabilize the pit area and highwall below <br />the topsoil stockpile. <br />