same design and construction specifications of the existing slurry wall. The new slurry wall tie- <br />in is intended to intersect the existing perimeter slurry wall and extend a minimum of 10 feet <br />outside of it at the bottom of the excavation. It is critical that the exact location of the perimeter <br />slurry wall be established in the field prior to construction of the tie-in. The crest width of the <br />interior dike where the proposed slurry wall is being constructed will be a minimum of 80 feet <br />across. The extra width is to provide adequate construction room for the slurry wall. If a <br />contractor would propose an alternate method of construction for the slurry wall that did not <br />require this extra width, it would be acceptable to reduce it to the same section as the remainder <br />of the interior dike. A detail of the design can be seen in the Arvada Reservoir Construction <br />Plans on Sheet 7. <br />After the proposed slurry wall tie-in, the top of the embankment will be reduced down to 25 feet <br />across the top. The embankment will be keyed into bedrock with a trench approximately 12 feet <br />wide at the bottom and six feet deep. The embankment will be a zoned embankment with Zone <br />1 a Clay-Shale Core with 2:1 side slopes and a top width of 15 feet. The Zone 2 overburden will <br />have side slopes of 3:1 and a top width of 25 feet. The materials used in the construction of the <br />embankment will have to meet the attached specifications. <br />As noted on the construction plans, the interior dike section is founded on competent clay shale <br />bedrock. This will require identifying where weathered shale ends and the competent shale <br />begins. An engineer familiar with the plans should be on-site during this critical time to <br />detemune how deep the excavation should go before the placement of the embankment begins. <br />It is also critical to not expose shale bedrock foundations for any more than one work shift. All <br />exposed foundation should be covered with a minimum of two loose lifts of fill prior to ending a <br />shift to prevent air slaking of the bedrock. The engineer will determine if excessive time has <br />passed on exposed foundation or if it has been protected adequately with cover. <br />CTL Thompson completed a slope stability analysis for the interior dike. Various zone <br />geometries and operating scenarios were evaluated to detemune the controlling case. The safety <br />factor criteria used are the same as those used for jurisdictional dams. The rapid draw down wa; <br />found to be the controlling case and a factor of safety was estimated to be 1.5 with conservative <br />assumptions. The results of this analysis can be found in the attached September 18, 2001 Slope <br />Stability Analysis Results. <br />The designers do not have any operating criteria from the proposed owners of the reservoir to <br />evaluate whether or not there would be any additional criteria recommended that might be <br />necessary for safe operation. If the reservoir is operated in a manner that requires rapid filling <br />and drawdown, there could be problems with slope failures that require additional maintenance. <br />It is recommended that operations be determined and planned around the existing design criteria. <br />The proposed reservoir does lie in the floodplain of the South Platte River as pointed out earlier. <br />The entire area will be completely inundated during major flooding events. Riverbank and <br />pitside stabilization techniques have been negotiated and agreed upon with Urban Drainage & <br />Flood Control District. There still maybe situations where the embankment is overtopped and <br />subsequent damage to the embankment may occur. <br />