My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2002-03-29_REVISION - M1999034 (2)
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1999034
>
2002-03-29_REVISION - M1999034 (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/16/2021 6:15:23 PM
Creation date
11/21/2007 3:34:07 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1999034
IBM Index Class Name
Revision
Doc Date
3/29/2002
Doc Name
Engineered Embankment TR
From
Applegate Group
To
DMG
Type & Sequence
TR3
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
47
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
COOLEY RESERVOIR AND FULTON WILDLIFE AREA PIT <br />EXHIBIT L -RECLAMATION COSTS <br />This is a revision for the reclamation costs included in the August 11, 1999 submittal. <br />The estimated costs for reclamation bonding associated with the proposed interior dike <br />are below: <br />ESTIMATED COSTS FOR RECLAMATION BONDING <br />OF THE INTERIOR DIKE <br />Activi <br />Approximate <br />Amount <br />35' depth x 400 <br />Unit Unit <br />Cost <br />LF $3.00 <br />Total <br />Cost <br />$1,200 <br />1. Constructing an intersecting slurry <br />wa11200 feet from each end of the , <br />dike will be constructed to tie-into <br />existing slurry wall. <br />2. Backfill and Regrade Slopes <br />379,260 CY $0,70 <br />Subtotal <br />5% Administrative Contingency <br />TOTAL <br />ESTIMATED COSTS FOR RECLAMATION BONDING <br />ALREADY COMPLETED <br />Activi Approximate -Unit Unit <br />1. Backfill and Regrade Slopes <br />2. Prepare and Place Topsoil <br />Amount Cost <br />244,440 CY $0.70 <br />6,875 CY $0.35 <br />Subtotal <br />5% Administrative Contingency <br />TOTAL <br />$265,482 <br />$266,682 <br />$13,334 <br />$266,682 <br />Total <br />Cost <br />$171,108 <br />$2,406 <br />$173,514 <br />$8,676 <br />$182,189 <br />The DMG staff determined that a bond of $925,300 was the appropriate bond amount for <br />this entire project. The technical revision of adding an interior dike cost estimate is <br />$266,682. Since $182,189 ofthe-reclamation work has already been completed and the <br />'proposed interior dike is scheduled to begin construction within the next 30 days, <br />Aggregate Industries proposes that the original bonding amount is adequate. Most of the <br />construction would be completed in such a short period of time that a new bond would <br />-not serve a useful purpose to protect the State. We would propose that if the construction <br />is not substantially complete and in compliance with the plans and specifications within <br />one year, that at that time the bonding would be reviewed and possibly modified. <br />RECEIVED <br />M:'"-'." .: ~ 2002 <br />Olvlsion of Minerals and Geology <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.