Laserfiche WebLink
~~ l~ <br />STATE OF COLORADO <br />OFFICE OF THE STATE ENGINEER <br />Division of Wa[er Resources <br />Department of Natural Resources <br />1313 Sherman Street, Room 818 <br />Denver, Colorado 80203 <br />Phone (303) 866-3581 <br />FAR (303) 866-3589 <br />www.watecs[a[eto.us <br />Response to Reclamation Permit Application Consideration <br />TO: Carl B. Mount, Senior Environmental Protection Specialist <br />CC: Division 1 Office <br />/~F' . ~~ A <br />e - 'b <br />i *~„~ I <br />0 <br />r <br />~~ 1896 <br />Bill Owens <br />Governor <br />Greg E. Walther <br />Executive Director <br />Hal D. Simpson, P.E. <br />State Engineer <br />FROM: Joanna Williams, Water Resource Engineer <br />DATE: December 4, 2003 RECEII/Ep <br />RE: Speer Mining Resources, File No. M-1983-176 <br />Section 34, Twp 1 S, Rng 67 W, 6th P.M., Adams County DECO $ ~$3 <br />Operator: Asphalt Specialties Co., Inc. <br />Contact: Asphalt Specialties Co., Inc. Oirision ~f Minerals and Geology <br />7321 E. 88th Ave., Ste. 100 <br />Henderson, CO 80640 <br />303-289-8555 <br />CONDITIONS FOR APPROVAL <br />^ The proposed operation does not anticipate exposing groundwater. Therefore, exposure of <br />ground water must not occur during or after mining operations. <br />® The proposed operation will consume ground water by: ®evaporation, ®dust control, ^ <br />reclamation, ®water removed in the mined product, ^ processing, ^ other <br />Prior to initiation of these uses of ground water, the applicant will need to obtain either a <br />gravel pit or other type of well permit, as applicable. However, prior to obtaining a permit, <br />an approved water supply plan or decreed plan for augmentation is required. <br />® Prior to approving a well permit, the applicant must conduct a field inspection of the site and <br />document the locations of all wells within 600 feet of the permit area. The applicant must <br />then obtain a waiver of objection from all well owners with wells within 600 feet of the permit <br />area or request a hearing before the State Engineer. <br />^ Other: <br />COMMENTS/NOTES: This gravel mining operation does not have a valid substitute water <br />supply plan for the current operation, approved by the State Engineer's office. The plan <br />was submitted to the State Engineer's Office in July 2000, however, additional information <br />is still required in order to process the plan. _ <br />Permit #~ ~ ~ Confidental~: <br />Class: Type-Seq. <br />From: To:. ~ /~, <br />Doc. Name: ~„O~V11 ff <br />Doc. Date (if no date stamp) <br />