Laserfiche WebLink
III IIIIIIIIIIIII III <br />999 <br />HOLLAND & HART <br />ATTORNEYS AT ULW <br />DENVER <br />DENVER TECH CENTER <br />caoanDO sPRINCs <br />ASPEN <br />BILLINGS <br />BOISE <br />C/1FYENNE <br />~AUwN <br />WASHINGTON, D C. <br />BY FAE (713-995-7191) <br />and II.B. ISail <br />SUITE 2900 <br />335 SEVENTEENTH STREET <br />DENVER, COIORAD080202~1979 <br />MNILING ADORE35 <br />v.o eoxB~+v <br />DENVER, caowoo eo2ol-e2+v <br />June 30, 1994 <br />Mr. Jim Tatum, Esq. <br />Law Offices of Jim Tatum & <br />Associates <br />8703 Bonhomme <br />Houston, TX 77074 <br />RE: Stock Rater 1Pe11 <br />Dear Mr. Tatum: <br />,. <br />c. <br />TELENgNF 100012958000 <br />EAC SIMllE 10001795~82e1 <br />TWk 010031-0568 <br />DAVLS O. O~C.ONNOR <br />10001295~BOBI <br />BY FAE (719-868-2612) <br />and II.B. Hail <br />Mr. Jim Tatum, Esq. <br />Law Offices of Jim Tatum & <br />Associates <br />P.O. Box 86 <br />12630 Hwy. 12 <br />Weston, CO 81091 <br />I am writing to introduce myself and Holland 6 Hart as <br />Basin Resources' new counsel in connection with several <br />matters, including your claim that Basin's ventilation shaft <br />has resulted in the dewaterinq of your stock water well. <br />while Basin continues to dispute whether the well was even <br />producing any water for a number of years before the shaft <br />was constructed and whether there is any relationship between <br />its current non-producing status and the construction of the <br />shaft, Basin has authorized me to restate and reaffirm its <br />offer, first tendered to you last spring, to either repair <br />the existing pump or to install a new windmill pump on the <br />well, at Basin's expense, in order to restore water <br />production to the surface. As you may know, Basin has <br />measured some 43 feet of water in the well so it believes <br />there is water which can be produced. Once the pump is <br />repaired or installed, Basin would be not be responsible for <br />its continued operation and maintenance. <br />If you find this proposal to be acceptable, and are <br />willing to promptly grant Basin and its contractors the <br />necessary access to the well site, Basin believes it can <br />complete the repair or installation work by August 1. <br /> <br />