Laserfiche WebLink
<br />z- <br />Apnllcation Review Procedares <br />The Division must act upon your application within thirty (30) days of receipt <br />T'he Division will grantyourrequestfor apermittransfer ifitfinds Uratthe successor operator is capable of ass~g all responsibility <br />far the conditions included under the original permit by virture of acceptable performanrP and financial warranties. Yom- request is <br />automatically approved if it has not been denied by the Division within thirty (30) days of filing. <br />ff the Permit Transfer application is denied, you will be notified within ten (10) days of the decision deadline. You may appear the <br />Division decision to the Mined Land Reclamation Board by submitting a written Rcgaest for Administrative AppealtotheBoardwidrirr <br />sixty (60) days ofthe date ofthe decision(please refer to C.R. S. 34-32-107 (Hard Rock Statutes), and CRS. 34-325-107 (Construction <br />Material Rules and Regulations) and C RS. 4-4-1tk1(9)). <br />Notice of Permit Transfer is aclmowledged in the monthly activity report attached to the monthly Board Agenda. <br />Once the Permit Transfer document is approved, the originally submitted Performance and Firrancial Warranties will be retumedto the <br />previous operator, as the previous operator is no longer responsrble for the reclamation of the transferred operation, <br />OTICE TO SIICCESSOR OPERATOR: <br />1) Once the Permit Transfer is approved, you will be responsrble for maintaining the mining and reclamation operations in <br />compliance with the Mined Land Reclamation Act and the Mineral Rules and Regulations for Hard Rock, Metal and <br />Designated Mming Operations or the Colorado LandReclamation AcifortheExtraction of Construction Materials andtbe <br />Construction Material Rules and Regulations. <br />2) All of the application materials, as amended and supplemented, are an integral part of the permit They have been <br />incorporated into the permit by reference. We suggest you keep a copyofthe permit, the pemrit application, and a copy of <br />the regulations at the mining operation as a reference. Ifyou are unable to secure a copy ofthe permit application from the <br />original operator, you may Purchase a copy from the Division. <br />3) Changesintheminiugandreclamstionoperationsthatdifferfi-omthosedescribedinthepennitmayrequitearevisiontothe <br />permit We suggest consulting the Mineral Rules and Regulations or the Construction Material Rules and Regulations <br />andlor ccmtacting us to determine if a revisiontothe permit is necessary. Rule l.8 and 1.10 pertains toAmendments,Rule <br />1.9 to Technical Revisions, and Rule 1.11 to Conversions. <br />4) On your permit anniversary date each year, you ST submit an annual fee and report to the Division. Please consult <br />C.R.S. 34-32-127(2) forHard Rock end Metal Mines or C.RS. 34-32.5-125 for ell constructionmataialsopemtionsforthe <br />applicable annual fee requirements for your operation <br />re~;n~ancv~roaNrss r r 7xwrF <br /><mnarmool <br />