Laserfiche WebLink
IV. ENFORCEMENT ACTIONS <br />The following identifies enforcement actions taken during this inspection, the required <br />abatement and date of abatement for the violation, previous violations still requiring <br />abatement and the termination of violations cited during previous inspections. <br />North Thompson Creek C-1981-025 <br />b June OS ~j <br />NOTE: Attach appropriate VIOLATIONS or CESSATION ORDER CODING FORMS <br />Notice of Violation CV-2005-007 was issued as a result of this inspection. The violation was <br />issued on 14 June 2005. The violation was issued for failure to maintain ditches to minimize <br />adverse impacts to the hydrologic balance in violation of Rules 4.05.3(1) and 4.05.3 (4) and for <br />failure to properly control the discharge from a treatment facility in violation of Rule 4.05.7. <br />First, the ditch from the discharge from the portals to the Long Pond was overflowing (but not <br />blocked, causing water to leave the ditch and flow down the light-use road. Water had, at <br />the time, flowed approximately 150 yards down the road. Second, water was flowing out of <br />treatment pond T-2 from the emergency discharge pipe, causing the discharge to flow <br />overland into pond P-9. Approximately Yz-acre was covered with water. <br />The abatement for this violation is first, to reassess the sizing of the ditch from the portal <br />discharge to the Long Pond and perform any other maintenance as necessary. Second, the <br />Operator needs correct the problem at the emergency spillway so that water no longer flows <br />overland into pond 9. Any changes to the approved permit will require a Technical Revision. <br />These abatements must be completed by 14 August 2004 <br />