Laserfiche WebLink
<br />Y • • III III III III IIII III <br />MINED LAND RECLAMATION DIVISION <br />STATE OF COLORADO, DEPARTMENT OF NATURAL RESOURCES <br />NOTICE OF VIOLATION NOV No. c-RFC• r.±'.9 <br />Permit No.: ~ F!1-01'~ Mine: ~'ouiSA ~* l s 7_ <br />Type of Mine: ,,NTxr.. n~.~~,.~1It-E~iZZn1_ County: ~~.~, <br />Operator (If Other than Permittee): Permittee: A,~ni~r-,~t~U °.:~~It,~T rC-AL C~_ <br />Mail Address: <br />Inspector: M SAyACi <br />Mail Address: 5G7C~ S. ~yf'C~cV~,C C~t'cLr- <br />`ui~C 4iA ~ENCU~N(X~~ ~ rr, uoll\ <br />Date/Time of Inspection: <br />FED 9 19~ 3 = 7~ PN\ <br />-T <br />Person Served: Served By: <br />YtN4~~ <br />Signature o person served i nature au oriz 'd representative <br />of Mined Land Reclam~ion Division) <br />ease prin name an tit a Date and Time of Service: <br />A.M. <br />CERTIFIED MAIL N0. FF"1?, IG, . t 9~ P.M. <br />Return Receipt Requeste <br />The Mined Land Reclamation Division ("the Division") has conducted an inspection of <br />the above mine and has made the findings stated in the attached schedule and has <br />found vio}ations of the Colorado Surface Coal Mining Reclamation Act, or violations <br />of required permit conditions, listed in the attached schedule. This notice <br />constitutes a separate notice of violation for each violation listed. <br />You must abate each of these violations within the designated abatement time. <br />Where-the remedial action requires submission of plans, the plans are to be <br />submitted to the Division within the designated time. You are responsible for <br />doing all work in a safe manner in compliance with all applicable laws and <br />regulations. <br />The undersigned finds that cessation of mining is is not X expressly, or in <br />practical effect, required by this notice. For this purpose, "mining" means <br />extracting coal from the earth or from a waste pile and transporting it within or <br />from the mine site. <br />C.R.S. 1973, 34-33-123(8) provides for imposition of civil penalties of up to <br />b5,000 for each violation and provides that each day of continuing violation may be <br />deemed a separate violation. <br />Important: Please read the reverse side of this page. <br /> <br />