My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2002-02-22_REVISION - M1977170
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1977170
>
2002-02-22_REVISION - M1977170
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/15/2021 11:41:43 AM
Creation date
11/21/2007 3:27:16 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1977170
IBM Index Class Name
Revision
Doc Date
2/22/2002
Doc Name
Financial Warranty Increase
From
DMG
To
Butala Construction Company
Type & Sequence
SI1
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
10
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
GIRGES Cost Est'mat'nD Software <br />EQUIPMENT MOBILIZATION /DEMOBILIZATION <br />Agency or organization name : DMG <br />TaskN: 008 State:Colorado Pennitlob M: M-1977-170 <br />Date: 01292002 Counly:ChaHee ADbreviaticn :none <br />User: JD1 SItB:BU(dle Gra vet Pd Filename:M1]0-006 <br />Permit ar other joD action :Phased Reclamation <br />Task tlescription : Mab/demob eg0ipmenf <br />EQUIPMENT TRANSPORT RIG COST Shift basis: 1 per day <br /> Cost tlata source : CRG Da!a <br />Truck tractor tlescription :Generic on-highway track tractor 6x4 diesel powered, 400 HP <br />Truck Trailer tlescription :Generic folding gocseneck , dmp deck equipment trailer (25T, SOi end 90TJ <br />Available rig capacities: 0-25 TOna 2F50 TOna 51+TOns <br />Cost Breaktlown~ Ownership wsUhour: $24.23 $28.32 53084 <br />Operatin cost/hour: 530.25 $32.95 $34.62 <br />Operator wst/hour: $26.54 526.54 $26.54 <br />Helper wst/hour: $22J0 522J0 522J0 <br />To[al Unit COSUhauc $103]1 $11050 $114.69 <br />NON-ROADABLE EQUIPMENT <br />Machine <br />Dascriplian -' - " - - weighUuni[ <br />-(Tons) - Ownership <br />CosUhdumt Haul Rig <br />CosUhrNnit Fleet Size <br />-(NO. units)" Haul Trip <br />Gasvhr/fleet Return Trip <br />'GasUm/tRet - DOT permit <br />CasVllaet- <br />-CAT 120H 12.52 310.84 $103.71 1 $118.55 $103.]1 $0.00 <br />-936F&sdg equip 20.00 333.00 $f03J1 1 $136.71 $103Jf $0.00 <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> Subtotals 525526 f207d2 50.00 <br />ROADABLE EQUIPMENT <br />Machine <br />Description <br />Totai <br />CosVhour/unit <br />Fleet Size <br />(NO. units) <br />Haul Trip <br />CosMrttleet <br />Retum Trip <br />Casvhrfllaet <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> Subtotals $0.00 50.00 <br />EQUIPMENT HAUL DISTANCE dTIM E <br /> Nearest mal or city or town within protect area region: Salida <br />Transoonafen Ovcle T'me' Nom Total one-way travel tlistance: 30 miles <br /> Roatlable Rcadabla Average travel speed: 30.0 mpA <br /> Equipment Equipment <br />Haul time (hours)= 0.10 0.10 Total non-roatlable moD/tlemob cost': $1,624.0] <br />Retum lima (hours)= 0.10 0.10 'rwp muy lope won harry <br />Loading time (hours) = 1.50 NA Total roatlable mob/tlemob cost'-' $000 <br />Unbading time (hours)= 1.50 NA arre mur0 top, no harry <br />Subtotals= 3.20 020 <br />JOB TIME AND COST Total lob time: 6.40 hours <br /> Total job cost: $1,624 <br />
The URL can be used to link to this page
Your browser does not support the video tag.