Laserfiche WebLink
ROADABLE EQUIPMENT sheet 2 of 2 <br />Nearest major city or town within project area region <br />Transportation Cvcle Time : Non- Total one-way travel distance <br />Roadable Roadable Average travel speed <br />Haul time (hours) = 0.17 <br />Retum time (hours) = 0.17 <br />Loading time (hours) = 1.00 <br />Unloading time (hours) = 1.00 <br />Subtotals = 2.33 <br />JOB TIME AND COST <br />Buena Vista <br />5.0 miles <br />30.0 mph <br />0.17 Total non-roadable mob/demob cost' : $2,425.45 <br />0.17 'two round trips with haul dg <br />NA Total roadable mob/demob cost " : $15.43 <br />NA "one round trip, no haul rig <br />0.33 <br /> <br /> Total job time : 4.67 hours <br /> Total job cost : 52.441 <br />EQUIPMENT HAUL DISTANCE and TIME <br />