Laserfiche WebLink
CIRCES Cost Estimatinst Software <br />PROJECT IDENTIFICATION <br />Task #: 001 <br />Date : 03/07/2007 <br />User: ESC <br />State :Colorado <br />County :Chaffee <br />Site :Trout Creek Pit <br />Permitrob# : iN-2001-035 <br />Abbreviation :none <br />Filename : M035-001 <br />Agency or organization name :DRMS <br />Permit or other job action :Minor Back611ing & Grading o/Material to Construct Detention Ponds <br />Task description :AM-01 <br />.................. <br />HOURLY EQUIPMENT COST <br />Basic machine :Cat D8R Series 11 - 8U (2005) Horsepower : 310 <br />Blade type :Universal <br />Attachment no. 1 :ROPS Cab Shift basis : 1 perday <br />Attachment no. 2 :3-shank ripper <br /> Data source : (CRG) <br />Utilization 3'0 <br />Cost Breakdown • Ownership cosUhour ; $58.50 NA <br />Operating cosUhour : $74.00 100 <br />Ripper op, cosUhour : .8'0.00 0 <br />Operator costlhour: $32.78 NA <br />Total umt cosUhour • $165.28 Total fleet cosVhour : jlgg,yg <br />MATERIAL QUANTITIES <br />Initial <br />volume: 5,000 LCY <br />Swell <br />factor : NA <br />Source of estimated volume :DRMS Estimate <br />Source of estimated swell factor : NA <br />Average push distance : 150 feet <br />Unadjusted hcudy production : 685.7 LCY/hr <br />Material consistency description <br />Conso/fdafed stockpile <br />Average push gradient : 0.00 % (1 <br />Average site altitude : 7,800 feet <br />Material weight : 2,650 Ibs/LCY <br />Weight description ; <br />Decomposed rock - 25% Rock. 75% EaAh <br />__ <br />JOB TIME AND COST <br />Fleet size : 1 Dozers) <br />Unit cost : $0.558 /LCY <br />Operator skill <br />Matedal consistency ~, <br />Dozing method <br />Visibility <br />Job efficiency ; <br />Spoil pile <br />Push gradient: <br />Altitude <br />Material weight <br />Blade type :_ <br />Net correction <br />Adjusted unit production <br />Adjusted fleet production <br />0.75 (a <br />1.00 (Ca. <br />1.00 (g, <br />1.00 (a, <br />0.B3 (fshi~ <br />0.80 ((nc <br />1.00 (Ca! <br />1.00 (Cat <br />0.87 (Cat <br />1.00 (S/S <br />0.43 <br />296.27 <br />LCY/hr <br />298.27 LCY/hr <br />Total job time : 16.88 <br />Total job cost : j$789 <br />Hours <br />