My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ENFORCE37165
DRMS
>
Back File Migration
>
Enforcement
>
ENFORCE37165
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 7:46:15 PM
Creation date
11/21/2007 3:25:38 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981048
IBM Index Class Name
Enforcement
Doc Date
9/11/1992
Doc Name
VIOLATIONS C-92-013 014 019 020 & 021
From
GREG LEWICKI & ASSOCIATES
To
MLRD
Violation No.
CV1992014
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
9
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br /> <br />POND {5 -Pl <br />The f olloriag criteria rere nsad in the design of the pond. <br />The pond rill: <br />_ 1. provide storage for the siaximum anticipated inflow <br />from a 30 year 24-hour precipitation event plus the <br />siszimum 3 year sediment wlume. <br />_ 2. nse a trapesoidal spillray rhich is designed to <br />discharge the runoff from the 25 year 24-hour <br />• storm. <br />3. provide for the elevation of the crest of the dam <br />to be at least 1.5 feet above the maximum rater <br />elevation rith the spillray floriag at design <br />depth. <br />4. use a Sa inch diameter deraterinq pipe aL the <br />dornstzeam outlet, The pipe rill permit 24-hour <br />detention time for the 10-year 24-hour storm <br />volume, and at the same time provide deraterinq of <br />~ the pond to the sediment storage level in less than <br />72 hours. <br />5. minimize the amount of disturbed surface area. <br />l <br />6. be cleaned rhea the sediment wlume reaches 601 of <br />capacity. Cleanout rill be provided by a piece of <br />` construction equipment operating inside the pond at <br />an area of stable, shallow slope. <br />7. be excavated in a manner that allows all topsoil to <br />be removed, stockpiled and re-used in reclamation. <br />8. be inspected during construction by a registered <br />professional engineer, <br />9. the discharge from the pond rill acct the <br />requirements as set forth in the NPDES permit. <br />10. be removed during reclamation. <br />CTt~ ~S P~~ ~Rfln~l. P©N~ ~ RE ~ ~ ~ - ~ ~ <br />5uC3fv~ ~ i -rE~ 4Y ~~ G•E~~uct O~ <br /> <br />~ F,+c-roaErz. ~9 <br />~PP2ov~ <br />1 1~8`~~ T~6S u~AS <br />QY ~~, <br />z <br />
The URL can be used to link to this page
Your browser does not support the video tag.