Laserfiche WebLink
STATE OF COLORADO <br />DIVISION OF MINERALS AND GEOLOGY <br />Department of Natural Resources <br />1373 Sherman St, Room 275 C O L O RA D O <br />Denver, Colorado 80203 D 1 v 15 l O N O F <br />Phone: (303) 8663567 M I N E RRA L S <br />fAX: (303) 832-8106 G E O L O G Y <br /> <br /> <br />June 2, 2003/ ~ RE CLAMATION•MIN[NG <br />SAFETY•SCIENCE <br /> Bill Owens <br /> Governor <br />Mr. Mark Nlchter Greg E. Walther <br />Continental Materials Corporation J Executive Director <br />225 W. Wacker Dr., Ste. 1800 Ronald W. Canany <br />Chicago, IL 60606-1229 Division Director <br /> <br />~ ~ Natural Resource Trustee <br />Re: Pueblo West Pit, Permit No. M-1977-573, Succession Approval, Revision No. S17-2 <br />Deaz Mr. Nichter: <br />On May 14, 2003, the Division of Minerals and Geology approved the succession of operators from Transit Mix of <br />Pueblo, Inc. to Continental Materials Corporation for this operation. Continental Materials Corporation is now the <br />permitted operator of the Pueblo West Pit, and as such, is responsible for all provisions in Permit No. M-1977-573, . <br />as well as those specified in the Rules and Regulations. Transit Mix of Pueblo, Inc. is relieved of all <br />responsibilities concerning this operation. <br />Please Note: <br />1. All of the application materials, as amended and supplemented, aze an integral part of your permit. They <br />have been incorporated into the permit by reference. We presume that you have a copy of all of these materials; <br />therefore, none have been enclosed with this mailing. We suggest that you keep a copy of the permit and the <br />permit application at the mining operation as a reference for operating personnel, to help ensure compliance with <br />the tent3s of the permit. <br />2. Changes in the mining and reclamarion operations that differ from those described in the permit may <br />require a modification to the permit. We suggest consulting the Rules and Regulations and/or contacting us to <br />determine if a modification to the permit is necessary. Rule 1.10 pertains to Amendments, Rule 1.9 to Technical <br />Revisions, and Rule 1.11 to Conversions. <br />3. On your permit anniversary date each yeaz, you must submit an annual fee and annual report to us. Please <br />consult the Rules, Act, and your permit for specific requirements. <br />If you have any questions, contact me. <br />Sincerely, <br />Harry H.'P6sey <br />Acting Senior Environmental Protection Specialist <br />cc: B. J. Fuller, Transit Mix of Puebla, Inc. <br />Office of Office of Colorado <br />Milled.9~AG1'1'&19fi84RllfAd_Mt977573_BMK_20030602_121652 PM.doc Ac[ive and Inactive Mines Geological Survey <br />