My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2002-03-11_REVISION - M1977344 (3)
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1977344
>
2002-03-11_REVISION - M1977344 (3)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/15/2021 2:49:31 PM
Creation date
11/21/2007 3:22:58 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1977344
IBM Index Class Name
Revision
Doc Date
3/11/2002
Doc Name
Permit Amendment Application
From
Holcim (US) Inc.
To
DMG
Type & Sequence
AM1
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
68
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
-5- <br />Resuonsibilities as a Permittee: <br />Upon application approval and permit issuance, this application becomes a legally binding document. Therefore, <br />there aze a number of important requirements which you, as a permittee, should fully understand. These <br />requirements aze listed below. Please read and initial each requirement, in the space provided, to acknowledge <br />that you understand your obligations. If you do not understand these obligations then please contact this Office <br />for a full explanation. <br />_ 1. Your obligation to reclaim the site is not limited to the amount of the financial warranty. You assume <br />legal liability for all reasonable expenses which the Boazd or the Office may incur to reclaim the affected <br />lands associated with your mining operation in the event your permit is revoked and financial warranty is <br />forfeited; <br />2. The Boazd may suspend or revoke this permit, or assess a civil penalty, upon a finding that the <br />permittee violated the terms or conditions of this permit, the Act, the Mineral Rules and Regulations, or <br />that information contained in the application or your permit misrepresent important material facts; <br />3. If your mining and reclamation operations affect areas beyond the boundaries of an approved permit <br />boundary, substantial civil penalties, to you as permittee can result; <br />4. Any modification to the approved mining and reclamation plan from those described in your approved <br />application requires to submit a permit modification and obtain approval from the Boazd or Office; <br />It is your responsibility to notify the Office of any changes in your address or phone number; <br />6. Upon permit issuance and prior to beginning on-site mining activity, you must post a sign at the <br />entrance of the mine site, which shall be cleazly visible from the access road, with the following <br />information (Rule 3.1.12): <br />a. the name of the operator; <br />b. a statement that a reclamation permit for the operation has been issued by the Colorado <br />Mined Land Reclamation Board; and, <br />c. the permit number. <br />7. The boundaries of the permit boundary azea must be mazked by monuments or other mazkers that aze <br />clearly visible to delineate such boundaries prior to site disturbance. <br />
The URL can be used to link to this page
Your browser does not support the video tag.