My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2004-06-20_REVISION - M1991083
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1991083
>
2004-06-20_REVISION - M1991083
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/15/2021 6:06:07 PM
Creation date
11/21/2007 3:22:46 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1991083
IBM Index Class Name
Revision
Doc Date
6/20/2004
Doc Name
State Engineers Response
From
DMG
To
LJ Development Inc
Type & Sequence
CN1
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
2
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
STATE OF COLORADO <br />OFFICE OF THE STATE ENGINEER oe co <br />Division of Water Resources ~6. `o <br />Department of Natural Resources RECElVE® ~_~$ <br />N <br />k f <br />DenverhColorado 80203om 818 ~~~ ~ ~ ~~ <br />Phone (303) 866-3587 ` raga' <br />FAX (303) 866-3589 ' <br />vrvrvvwatecstate.co.us ~ Division ~f Minerals and Geology 8iii ovrens <br />Governor <br />Response to Reclamation Permit Application Consideration Rtuseu George <br />Executive Director <br />Hal D. Simpson, P.E. <br />DATE: June 18, 2004 state Engineer <br />TO: James Dillie, Environmental Protection Specialist <br />CC: Division 2 Office; Dts ct 13 Water Commissioner <br />FROM: Don West, P.E. <br />RE: Ula Pit, File No. M-1991-083 Conversion <br />Operator: Seifert Construction <br />Contact: Kent Beach 719(783-2757 <br />Section 16, Twp 22S, Rng 73 W, 6th P.M, Custer Cotmty <br />CONDITIONS FOR APPROVAL <br />® The, proposed operation does not anticipate exposing groundwater. Therefore, exposure of ground <br />water must not occur during or after mining operations. If stormwater is contained on-site, it must <br />infiltrate into the ground or be released to the natural stream system within 72 hours, or all work <br />must cease until a substitute water supply plan, or augmentation plan approved by water court, is <br />obtained. Reclamation plans must ensure water will not be retained onsite for more than 72 hours <br />tmless an augmentation plan approved by water court is obtained. <br />^ The proposed operation will consume ground water by: ^ evaporation, ^ dust control, <br />^ reclamation, ^ water removed in the mined product, ^ processing, ^ other:. <br />Prior to initiation of these uses of ground water, the applicant will need to obtain either a gavel pit <br />or other type of well pemvt, as applicable. However, prior to obtaining a permit, an approved water <br />supply plan or decreed plan for augmentation is required. <br />^ Prior to approving a well permit, the applicant must conduct a field inspection of the site and <br />document the locations of all wells within 600 feet of the permit azea. The applicant must then <br />obtain a waiver of objection from all well owners with wells within 600 feet of the permit azea or <br />request a hearing before the State Engineer- <br />® Other: Applicant must haul water from an approved off-site source if water is to be used for <br />crushing, screening, or producing hot mix or concrete. <br />CObTii'IENTS: <br />
The URL can be used to link to this page
Your browser does not support the video tag.