My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ENFORCE37059
DRMS
>
Back File Migration
>
Enforcement
>
ENFORCE37059
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 7:46:11 PM
Creation date
11/21/2007 3:22:41 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1994113
IBM Index Class Name
Enforcement
Doc Date
12/18/2000
Doc Name
FAX COVER
From
BENDELOW LAW FIRM
To
DMG
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
12
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
12/12/2000 11:50 970728555 BENDELOW TELLURII~ PAGE 11 <br />21. Five Pages of Blue Linc Maps entitled "As-Built of Public Srnice Company <br />Pipeline Through Pathfinder Development", Drawing path: Q:\Drawings\SS~PSC- <br />COVR, Sheets 1 through 5; and Fivc Pages of Blue Line Maps entitled "As-Built <br />of Public Service Company Pipeline Through Pathfmder Development", Drawing <br />path: X:UOBSISCOTTSMITH\91043\PSC-PIPE, Sheets 2 through 6 submitted <br />by Pathfinder Development, Ina(PATH). <br />22. Ten certified topics from the Colorado Division ofMineralsand Geology, <br />Minerals Program Inspection Reports dated 8-29-00, 8-29-00, 8-2-00, 7-11-00, <br />5-25-00, ] 1-12-99, 12-17-97, 7-10-96, 7-10-96 and 5-6-96 submitted by Stefanie <br />Solomon {JANK)r). <br />23. Photograph dated September 2, 1951, stated in the Public Hearing, this is now the <br />access road on the Pathfinder Development property, submitted by Bill Janke <br />(JANKE). <br />24. Photographs (three) received from the MLRB Hearing of 1997 Haul Road <br />Blowout submitted by Bill Janke (JANKE). <br />25. Photographs (three) received from the MLRB Heating of 1998 showing the width <br />of the road submitted by Bill Janke (JANKE). <br />2G. Photographs (three) received from the MLRB Hearing of 1999 showing the width <br />of the road submitted by Bill Janke (JANKE). <br />27. Photograph, maybe 2000, showing the width of the road submitted by Bill Janke <br />(JANKE). <br />28. Affidavit of Operator dated August 29, 2000 signed by Scott Smith and verifies <br />importation of fill submitted by Stefanie Solomon (JANKE). <br />29. Affidavit of Peter A. Staufer, P.B. of Michael W, West & Associates, Inc. on <br />review and analyze the CTLlThompson, Inc. report dated October 16, 2000 and <br />submitted by Stefanie Solomon (JANKE). <br />30. Letter dated August 31, 2000 from J. David Foley to Scott Smith regarding <br />Monitoring of Public Service Company pipeline submitted by Scott Smith <br />(PATH). <br />31. Letter dated May 29, 1998 frrom Scott Smith to Public Service Company <br />regarding Ames Hydro Penstock submitted by Stefanie Solomon (JANK);). <br />32. Mined Land Reclamation Board Minutes from September 21, 2000 on Pathfinder <br />Development, Inc. submitted by Tom Kennedy (PATH). <br />
The URL can be used to link to this page
Your browser does not support the video tag.