The reclamaton plan calls for returning the disturbed areas, after mining and reclamation. to a land use that e <br />'general agr+cultural' This land use a consistent with that found m the surrounding area Because of the -dry <br />land" nature of the seed mix presented herein. urgatron of the disturbed areas will not be attempted. <br />The predominate feature of the reclaimed area will be a flat graded area approxanately 25 feet below the <br />surrounding undisturbed elevatan A Reclamaton Plan Map depaUng the confguration of the reclamed <br />ground surface can be found in 6di+bit F <br />Reclamation will be conducted in a phased manner and will start in each phase at the time when the sand and <br />gravel resource has been depleted In other words. reclamation may happen during the same time as gravel <br />extraCtbn activdies are occurting in each phase. Since no more than 30 acres will be disturbed a[ one Ume <br />Except the staging area, reclamation efforts will begin prpr to and simultaneously wdh fhe next sand and gravel <br />removal process The initial reclamation efforts, consisting of sloping and grading began during 2001a1ong the <br />westerly boundary of Phase One Reclamation will occur on a 12 to 18 month cycle until all mining activdies <br />have ceased. <br />BACKFILLING AND GRADING - AS each of the extractan have the resource removed, the backfitling and <br />grading actmues will commence except for any working gravel faces(s) The stockpiled overburden wit be <br />hauled from ds storage area adjacent to the mining area by mobile equipment and placed where required to <br />achieve a level topography and properly backfilled slopes. In order to achieve a'natural' appearance the side <br />slopes of the exlractron they wilt be regraded rtregular and will range from no steeper than a rata of 2: t <br />(twr¢ontal to vertaaq to a ratio of 3 1 Appropmately 50 percent of the total length of the slopeswdl begraded <br />to the 2,1 ratio. BackUlling and grading will be done by dozers, andlor, scrapers which will compact and <br />stabile the overburden material. To insure stability of the slopes. material will be placed m 12 inch lifts and <br />compacted to a minimum density of 85 percent. <br />In the event that material delivered to the facddy is used m the t>ackhlhng and grading operations, the lollowmg <br />procedure will be implemented to insure that the material is clean and inert <br />1 The indmdual or company delnrenng material to the facility is required to sign an affidavk certdYn9 that <br />the material +s. clean and inert, the originating source of the material, and the estimated volume. At the <br />discretion of the tastily operator, the certificatron may also include an environmental audd of the source <br />site prepared by a Colorado Registered Professbnal Engineer or a Registered Environmental <br />Manager <br />2. During the stockpiling process, the facility manager, and those Individuals who operate the stockpiling <br />equipment, will conduct constant visual analysis of the delivered material on a truck by truck basis. At <br />a minunum, the visual evaluation will xientrly that the soil does not have any hydrocarbon <br />contaminaton, hazardous substances, or other solid waste <br />3 In the event that contaminated material is identified, all work m the xnmediate area will cease and a <br />Colorado Registered Professanal Engineer or a Registered Environmental Manager will be contacted <br />by the facility operator The listed qualified mdivxlual(s) will prepare, superv+se and xnplement a <br />Remediatan and Disposal Plan conducted m accordance wdh the requirements o1 the governing <br />regulatory agencies. <br />TOPSOIL REPLACEMENT -Topsoil replacement will occur m a phase by phase manner using mobile <br />equipment once all re-grading of the area disturbed by mining 5 complete Topsoil will be replaced to a <br />thirkness of at least 8 inches which is appropriate to establish vegetatan commundies consistent wdh the post <br />mine land use <br />RE-VEGETATION -The intent of the re-vegetatron is the estabhshmentof plantcornmunibesconsistentwith the <br />post-mine land use. After topso+I replacement. seed bed preparatan aril stabd¢atonwiill beconducted andwdl <br />t <br />Rav 08/t0A3 <br />