Laserfiche WebLink
<br /> 999 <br />Wyoming foal Company <br />445 Union Boulevard • Suite 310 • Lakewood, Colorado 80228 • Telephone (303) 989-5037 <br />RECEIVEp, " , <br />April 16, 1984 ~' <br />APR 17 1984 '~'' <br />Ms. Susan Mowry MCoW ~e D RECfq~{gnONDIVIS-p(r ` <br />Colorado Mined Land Reclamation Division PL of Natural Re <br />1313 Sherman Street sources - <br />Denver, Colorado 80203 <br />RE: Additional Information for Wyoming Fuel Company's (WFC) Minor Revision for <br />Grading and Foundation Work at the New Elk Mine, Permit No. C-012-81 <br />Dear Ms. Mowry: <br />In our telephone conversation of April 13, 1984 you had requested some additional <br />information and clarification regarding WFC's April 2, 1984 request for a minor revision. <br />Following are WFC's responses. <br />1. At this time WFC has not decided where the water treatment plant will be located. <br />After removal we will utilize an existing leach field. This leach field will handle the <br />• present domestic waste load at the New Elk Mine. We will notify you when and if <br />we decide to put in another plant. <br />2. The preliminary drawing (grading plan) for the minor revision has been finalized and <br />is attached. In order for WFC to make room for the plant facilities it was necessary <br />to shorten pond 006 to the east. Shortening the pond length will require the pond to <br />be deepened by four feet. The original pond capacity was 7.51 acre feet, the new <br />volume will be 7.55 acre feet. The inlet point will still be on the southwest corner of <br />the pond and rip-rapped. <br />Your remaining questions regarding drainage to pond 006 are self-explanatory on the <br />attached drawing. <br />3. Following are the bond calculations for foundations under this minor revision. <br />Bonding Calculation for Concrete <br />1. Plant Footings <br /> 5760 sq.ft. x $4.38/sq.ft = $ 25, 228.80 <br />2. Thickener <br /> 7850 sq.ft. x $4.38/sq.ft = 34,383.00 <br />3. Raw Coal Reclaim Tunnel <br /> 3840 sq.ft. x $4.38/sq.ft = 8, 409.60 <br />4. Clean Coal Reclaim Tunnel <br /> 1,920 sq.ft. x $438/sq.ft = 8,409.60 <br />5. Conveyors <br />. 600 sq.ft. x $438/sq.ft = 2,6.18.00 <br />TOTAL $ 79, 059.00 <br />