Laserfiche WebLink
<br />remediation and to notify DMG if further movement occurred. Please <br />provide the remediation plan and notifications as required. <br />The following is a list of maintenance items noted in this <br />inspection: <br />1. Perform seasonal maintenance of Goat Trail, including removing <br />fallen rock, restoring of ditches, cleaning downdrains and <br />culverts. <br />2. Maintenance of liner and rip rap in outlet channels of West <br />Ridge Hydrologic Reconstruction Area. <br />3. Maintenance of culverts SK-1 and SK-5. <br />4. Repair small rilled areas in West Ridge reclamation. <br />5. weed control is needed, particularly thistle. Although thistle <br />is prevalent across the. site, the following areas have been noted <br />as needing attention: reclaimed road near super curve; all along <br />the corridor of west Ridge Drainage Reconstruction; top of West <br />Ridge reclamation; slope around downdrain #4 in Moffat Area; all <br />areas where sediment has been deposited into native vegetation (see <br />NOV C-97-007.) <br />6. Additional efforts need to be taken if areas that are currently <br />almost barren of vegetation haven't experienced significant plant <br />growth by the appropriate time for seeding. Specifically areas of <br />West Ridge, reclaimed explosives area, and road narrowing areas <br />should be monitored. Mulch is probably appropriate until vegetation <br />is established. <br />~/6/-{'L' ~~y / _ / <br />~'1 Cv~i C{ W ~l i CK 12'Y4f0/~ T~ <br />'~ 6~ c, d, e ~~~ -+G-o- evdo1'cP~ <br />ac-{ ~ tHt ~7~u n s{we o~ ~n i's <br />~r-ew~ Nav ~~vsra-i 7Gtrk- .rF'ayo~ <br />cvt ffCe. d.lsfav~-~~. <br />CUKIr~U+- 3~t u/ti ~'clti cva~~ u-c~~v <br />Ctn ~ <Jat ~ J+G7~"ac~c . <br />