Laserfiche WebLink
Ra ti onalc of Proposcrl Li vil Pcnnlty <br />.Snowmass Coa 1 C.'omnnny <br />N.O.V. 81-50 - .Surface [dater Monitoring <br />For the purpose of arriving at a civil penalty for N.O.V. 81-50, violations <br />of the Act 34-32-129(1), 34-33-122(2)anrl (3), and 34-33-Z23(2) were combined in <br />this assessment. <br />story of Pm vious Violations (5.04.5(2) (a)) <br />Three violations (81-29, 81-3G, 8]-38) x 550.00 <br />.Seriousness of Violation (5.09.5(2)(b)) <br />Assessed for the cost of monitoring <br />(See Attachment .'~) <br />Fault (5.04.5(2)(c)) <br />knowing, Intentional Conduct <br />TOTAL <br />Total Penaltq Rounr7ec7 to: <br />= ti 150.00 <br />_ .51,13.00 <br />= 51,500.00 <br />;2,786.00 <br />$2,780.00 <br />i' . <br />~.~ r; <br />y~ ' ~~c`~ T-, <br />DATE: January 28, 1982 Inspector ~ ~ r'~ ~ ~~- ~ '~; i.~: C' <br />