Laserfiche WebLink
Reclamation Cost <br /> Remove 2 " diameter Pipe in 4"diameter sieve (3&4 Pads) <br /> Production Rate Linear Feet <br /> Feet/ MS Feet/ Hr. 5480 <br /> Remove Pipe 910 113.75 <br /> Prod. Labor Equip. Material Hourly Total <br /> Equip. Number Units Rate Hours Cost Cost Cost Cost Cost <br /> Remove Pipe: Chain saw 2.0 5480 227.5 24 17.55 3.94 21.49 1032 <br /> Backhoe/Loader 1.0 - - 24 23.20 27.35 50.55 1213 <br /> Truck-16 ton 1.0 24 20.31 55.28 75.59 1814 <br /> Foreman Pickup 1.0 6 32.35 10.78 43.13 259 <br /> Total Cost 4318 <br /> • <br />