Laserfiche WebLink
r <br />Ilk <br />1 <br />r <br />d\ \ e <br />Ready Linc <br />Squaw Gulch <br />Overburden <br />Storage <br />in Mine <br />Q <br />Q <br />EMP 007 <br />TO psoil Strxkrrilc <br />Topsoil Stockpile <br />j <br />Potential <br />IN <br />Water Tank . <br />Oft Load Area <br />Clay Borrow <br />Primary Crushers <br />LOB <br />Ore Su <br />RECE! VEp <br />1 <br />D <br />a <br />'I psod stockpile: <br />1 <br />D <br />19 <br />EMP 010 <br />Q \ \ me ndment No. 8 Permit boundary <br />,0 <br />ii I V <br />Ironclad Office & Stock Pond <br />Maintenance Facility <br />Employee Parking Lot <br />Bulk Emulsion Facility <br />New Truck Shop <br />Tire Pad <br />Explosives Magazin <br />Topsoil <br />Main Cresson Mine <br />o srockp ROM Stockpile <br />ime Silo _ <br />Fuel Farm i <br />ry Crushers <br />;e IV ADR Areclua GU"- <br />Substation <br />EMP 011 <br />er Tank <br />0, <br />obi �- <br />I�g . <br />�Overb , den t �kQ�e <br />Storage oQs° ..v <br />006 ; <br />r� <br />Power <br />EMP 005 <br />Rev# Description <br />I Updated Facilities <br />2 Updated Facilities <br />Updated Facilities Surface Mines <br />4 Updated Facilities Drawing <br />5 Updated Facilities Drawing <br />Victor <br />REVISIONS <br />Ilk <br />AV <br />ra <br />RE <br />IF <br />0 <br />p <br />a <br />Goldfield <br />RECE! VEp <br />NOV 0 7 2002 <br />Division of Minerals and Geology <br />Permit #: - Confidental?: <br />Class: - Type -SE <br />From To: <br />t 1 Doc. Name. 1A) '0 M i Mka <br />1 Doc. Date (i no date stamp): <br />Legend <br />Planned Backfill <br />Potential Backfill <br />Amendment No. 8 Permit Boundary <br />County /State Roads <br />Haul Road <br />EMP: Enhanced Management Practice <br />(Storm Water) <br />Note: <br />Actual Backfill may vary due to changing <br />mining or economic conditions. <br />Victor Gold Mining Company <br />Cripple Creek & <br />Date BY CHK 1\111, <br />A Joint Venture - ANGLOGOLD (Colorado) Corp., Manager anglQ•. <br />3 01 TDII <br />04 -25 -01 TDH <br />Drawing C -4c: Proposed Facilities- Overburden and Mines <br />051001 TDH <br />06 -03 -02 TCC <br />Permit M -80 -244 Amendment No. 8 <br />11 -04 -02 ICC <br />Date: 3 -24 -2000 Scale: I" = 750' A8C4_Rev5_Nov2002.dwa REV: E (5th) <br />