My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ENFORCE36901
DRMS
>
Back File Migration
>
Enforcement
>
ENFORCE36901
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 7:46:05 PM
Creation date
11/21/2007 3:18:20 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1994082
IBM Index Class Name
Enforcement
Doc Date
9/1/2004
Doc Name
Pattern of Violations Letter
From
DMG
To
Peabody Energy
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
8
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• Species diversity success standard clarifications <br />• Assessment of woody plant density success in concentrated <br />planting areas in 2004 <br />Recent Inspection Report Issues <br />July 2004 <br />• Pond 16A in-slope slide repair plan or final certification <br />• Permanent channel construction in progress "A" and "B" Pits (designs under review <br />TR-45) <br />• Aspen study plot installation progressing (transplanting to be done October 2004) <br />• "A" Pit highwall slide issues <br />• short term repair this slide <br />• longer term need to modify permit to include measures to address steep slope <br />stability, especially in similaz final highwall locations <br />May 2004 <br />• Noted minor leaks Pond 6 and 16A primazy spillways <br />• Pond 16A...investigate slide and submit remedial plan if warranted by 7-1-04. <br />Otherwise, submit final certification by 7/1/04. <br />Apri12004 <br />• Request Pond 16A certification upon completion of slide repair later this yeaz <br />• Remove failed well casings and seal holes w/concrete (below Pond 16A <br />embankment) <br />• 2003 permit exploration drill site hole plugging <br />• silt fencing at soil stockpiles AAA and CCC <br />• Incorporate comprehensive weed mgt. plan into permit, via midterm response TR <br />• Noted concentrated shrub seedings and plantings required in fall 2004 in "D" Pit and <br />"A" Pit reclamation azeas <br />• Shrub and aspen planting azeas along ridgeline (2 concentrated seeding/planting <br />azeas) to be planted and fenced fa112004 <br />• Submit MR application w/aspen test plot sapling harvest locations and aspen "farm <br />plot" location and plan to be submitted by 8/1/04 <br />
The URL can be used to link to this page
Your browser does not support the video tag.